Project details
| Official title | Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No. SEIAA/MS/2022/1318 with production capacity of 52554 TPA over an area of 4.74 ha on the Sutlej River Bed located at Village- Malewal, Tehsil Shri Chamkaur Sahib, District Rupnagar, Punjab through XEN/DMO District Rupnagar Govt. of Punjab |
|---|---|
| Status | Environmental approval granted |
| Status since | 7 Mar 2023 |
| Application filed | 7 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Department of Irrigation |
| Land area | 11.7 acres (4.7 ha) |
| Project cost | ₹39 lakh |
| Village / locality | Malewal (107) |
| Taluk / tehsil | Chamkaur Sahib |
| District | Rupnagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00132 |
In context
36 applications in Rupnagar since January 2022 are in the same category (Mining): 25 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 11.7 acres, this one is smaller than 61% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Malewal (107), Chamkaur Sahib, Rupnagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining (boulder, gravel, sand) as per DSR No. SEIAA/MS/2022/1318… — environmental approval granted, 1.1 km away
- Proposed Sand Mining (boulder, gravel, sand) as per DSR No. SEIAA/MS/2022/1318… — cleared for impact study, 1.1 km away
- NOC for 14.95 Ha. of forest land for the purpose of Desilting of River Sutlej — lapsed, 1.6 km away
- Desilting of River Sutlej Opp Village Bela Tajowal (Rail Majra Complex) — lapsed, 2.7 km away
- Desilting of River Sutlej opp village Bela Tajowal (Rail Majra Complex) — lapsed, 2.7 km away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — environmental approval granted, 4 km away
- Proposed 165000 TPA Writing & Printing Paper Plant by M/s Ruchira Papers Limited — lapsed, 6.9 km away
- Proposed 165000 TPA Writing & Printing Paper Plant by M/s Ruchira Papers Limited — cleared for impact study, 6.9 km away
More from Department of Irrigation in Rupnagar
- Diversion of 0.063 Hec. Forest Land Permission for Laying Underground Pipeline… — forest land use approved
- DIVERSION OF 41.1129 Ha (21.5531 Ha PF/Strips & 19.5598 Ha PLPA) FOREST LAND… — lapsed
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — lapsed
- Project for Construction of Dashmesh Canal — lapsed
- Proposed Sand Mining (boulder, gravel, sand) as per DSR No. SEIAA/MS/2022/1318… — lapsed
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted
28 Department of Irrigation, Punjab projects in Rupnagar
All 157 Department of Irrigation, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.