Proposed Commercial Colony "creek Side Village"

Proposed Commercial Colony "creek Side Village" is an approved building project in Doraha Mandi, Payal, Ludhiana, Punjab. The site covers 21.2 acres. Its stated project cost is ₹10.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Jul 2023).

See it on the live map All projects in Ludhiana

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Proposed Commercial Colony "creek Side Village"?

Proposed Commercial Colony "creek Side Village" is an approved building project in Doraha Mandi, Payal, Ludhiana, Punjab. The site covers 21.2 acres.

Who is building it?

The applicant is Havenley Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 21 Jul 2023), as of 27 Nov 2026.

Where is it?

In Doraha Mandi, Payal, Ludhiana, Punjab.

How big is it?

It has a stated cost of ₹10.9 crore and a site of 21.2 acres.

When was it filed?

The application was filed on 21 Jul 2023.

Project details

StatusEnvironmental approval granted
Status since21 Jul 2023
Application filed21 Jul 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantHavenley Developers
Land area21.2 acres (8.6 ha)
Project cost₹10.9 crore
Village / localityDoraha Mandi
Taluk / tehsilPayal
DistrictLudhiana
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-00155

What the filings say

What is planned

Havenley Developers proposes to develop a commercial colony named "Creek Side Village" on a plot area of 8.56 hectares (21.1425 acres). The applicant's conceptual plan specifies a total built-up area of 30,390.10 square metres.

The project is designed to accommodate various commercial activities, including shops, food courts, restaurants, and a brewery. The development is organized into nine building blocks (Block A to Block I) and several drive-thru facilities.

Project Components

ItemDetail
Total Plot Area85,561 sqm (21.1425 acres)
Total Built-up Area30,390.10 sqm
Ground Coverage30,390.10 sqm (35.50%)
Green Area4,681 sqm
Total Units (Shops)130
Food Courts2
Restaurants4
Brewery1
Anchor Stores5
Total Expected Population2,475 persons

Layout and design

The layout features a series of building blocks arranged around water bodies and pedestrian movements. The design includes 20-foot wide bridges and 8-foot wide pedestrian paths. A 35-foot wide internal road system provides access throughout the colony.

Traffic within the project is designed as a one-way system with separate entry and exit gates. The project proposes a total of 480 Equivalent Car Space (ECS) parking slots, distributed as 161 at the rear, 287 inside, and 32 at the front.

Water, power and access

The total water requirement for the project is estimated at 81 kilolitres per day (KLD). Of this, the domestic fresh water demand is approximately 48.5 KLD, while 32.5 KLD will be met through recycled water for flushing. During the summer, an additional 26 KLD of recycled water is allocated for gardening.

Waste water generation is estimated at 65 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 75 KLD. The treated water will be used for flushing, landscaping, and tree plantation.

The total power load for the project is estimated at 2,900 kW. The applicant proposes energy conservation measures to save approximately 700 kW (24%), including the use of LED lighting and the installation of rooftop solar panels with a 500 kW capacity.

The site is connected to National Highway 44 (Ludhiana-New Delhi).

Environmental safeguards

The project includes a storm water collection system designed to be self-sufficient. It features 11 rain water harvesting (RWH) pits with an effective diameter of 4.5 metres and a depth of 4 metres to capture run-off.

Solid waste generation is estimated at 372 kg per day. The applicant plans to segregate waste at source into bio-degradable (186 kg), recyclable (167.4 kg), and inert/e-waste (18.6 kg). Bio-degradable waste will be treated through vermi-composting on-site to be used as manure. Recyclables will be sold to authorized vendors.

A green belt will be developed over an area of 85,561 square metres (representing the total plot area's landscape potential), with a plan to plant 1,070 trees. Species selected include Arjun, Gulmohar, Baheda, Simbal, Pipal, and Banyan.

Timeline

The applicant has budgeted ₹123.2 lakh for capital costs related to environmental management during the construction phase, covering medical aid, toilets for workers, wind-breaking curtains, and the construction of the STP and RWH systems. Recurring costs for environmental maintenance during the operation phase are estimated at ₹33.7 lakh per year.

Commercial Colony Creek Side Village site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Commercial Colony Creek Side Village: Master layout plan: building blocks, water bodies, roads and parking zones (preview)🔒 Sign in free to see it
Master layout plan: building blocks, water bodies, roads and parking zones
Commercial Colony Creek Side Village: Water balance diagram showing fresh and recycled water flow (preview)🔒 Sign in free to see it
Water balance diagram showing fresh and recycled water flow
Commercial Colony Creek Side Village: Flow diagram of the 75 KLD Sewage Treatment Plant (preview)🔒 Sign in free to see it
Flow diagram of the 75 KLD Sewage Treatment Plant
Commercial Colony Creek Side Village: Technical drawing of the proposed Rain Water Harvesting structure (preview)🔒 Sign in free to see it
Technical drawing of the proposed Rain Water Harvesting structure

In context

158 applications in Ludhiana since January 2022 are in the same category (Buildings & townships): 113 approved, 16 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21.2 acres, this one is larger than 64% of them.

35 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Doraha Mandi, Payal, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.