Quick answers
What is this project?
New Chemical Manufacturing unit by M/s Chemoro Industries Limited is an approved industrial project in Dabanheri, Rajpura, Patiala, Punjab. The site covers 2.7 acres.
Who is building it?
The applicant is Chemoro Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Feb 2023), as of 27 Nov 2026.
Where is it?
In Dabanheri, Rajpura, Patiala, Punjab.
How big is it?
It has a stated cost of ₹12 crore and a site of 2.7 acres.
When was it filed?
The application was filed on 22 Feb 2023.
Project details
| Official title | New Chemical Manufacturing unit at village Dhamanheri, Siel Chemical Complex, Tehsil-Rajpura, District-Patiala , State-Punjab. by M/s Chemoro Industries Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Feb 2023 |
| Application filed | 22 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Chemoro Industries Limited |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹12 crore |
| Village / locality | Dabanheri |
| Taluk / tehsil | Rajpura |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00173 |
In context
45 applications in Patiala since January 2022 are in the same category (Industry): 29 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.7 acres, this one is smaller than 71% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dabanheri, Rajpura, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Unit for Manufacturing of Chlorinated Methyl Fatty Ester… — environmental approval granted, 50 m away
- Industrial project by M/s Shivtek Spechemi Industries Ltd. — cleared for impact study, 50 m away
- Industrial project by M/s Shivtek Spechemi Industries Limited — returned to applicant, 50 m away
- Proposed Industrial Unit for Manufacturing of Chlorinated Methyl Fatty Ester… — cleared for impact study, 50 m away
- Expansion in existing unit for increase in the production of Chlorinated… — environmental approval granted, 200 m away
- Expansion in existing unit for increase in the production of Chlorinated… — cleared for impact study, 200 m away
- Industrial project by M/s Flowtech Chemicals (P) Ltd. — environmental approval granted, 250 m away
- Amendment in Environmental Clearance to Increase the Supply of Chlorine… — environmental approval granted, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.