What is Developing? Open the mapMap

Cleared for impact studyIndustry · Fatehgarh Sahib, Punjab

Expansion in the existing Steel Manufacturing unit M/s G.O. Steel Private Limited

Expansion in the existing Steel Manufacturing unit M/s G.O. Steel Private Limited is a proposed industrial project in Badinpur, Amloh, Fatehgarh Sahib, Punjab. The site covers 7.1 acres. Its stated project cost is ₹71.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Aug 2023).

See it on the live map All projects in Fatehgarh Sahib

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in the existing Steel Manufacturing unit M/s G.O. Steel Private Limited is a proposed industrial project in Badinpur, Amloh, Fatehgarh Sahib, Punjab. The site covers 7.1 acres.

Who is building it?

The applicant is G O Steel Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Aug 2023), as of 27 Nov 2026.

Where is it?

In Badinpur, Amloh, Fatehgarh Sahib, Punjab.

How big is it?

It has a stated cost of ₹71.6 crore and a site of 7.1 acres.

When was it filed?

The application was filed on 4 Aug 2023.

Project details

Official titleExpansion in the existing Steel Manufacturing unit M/s G.O. Steel Private Limited at Village- Kahanpura, Badinpur road, Mandi Gobindgarh, Tehsil- Amloh, District- Fatehgarh Sahib, Punjab
StatusCleared for impact study
Status since4 Aug 2023
Application filed4 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantG O Steel Private Limited
Land area7.1 acres (2.9 ha)
Project cost₹71.6 crore
Village / localityBadinpur
Taluk / tehsilAmloh
DistrictFatehgarh Sahib
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-00206

In context

85 applications in Fatehgarh Sahib since January 2022 are in the same category (Industry): 70 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.1 acres, this one is larger than 67% of them.

23 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Badinpur, Amloh, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.