Expansion in the existing Steel Manufacturing unit M/s Timexo Metals Pvt. Ltd. at Backside Gobind Casting, Kanganwal road, Village- Jaspal Bangar, Tehsil & District- Ludhiana, Punjab is a proposed industrial project in Jaspal Bangar, Ludhiana (West), Ludhiana, Punjab. The site covers 5 acres.
Who is building it?
The applicant is Timexo Metals Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Aug 2023), as of 27 Nov 2026.
Where is it?
In Jaspal Bangar, Ludhiana (West), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹31.5 crore and a site of 5 acres.
When was it filed?
The application was filed on 9 Aug 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Aug 2023 |
| Application filed | 9 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Timexo Metals Private Limited |
| Land area | 5 acres (2 ha) |
| Project cost | ₹31.5 crore |
| Village / locality | Jaspal Bangar |
| Taluk / tehsil | Ludhiana (West) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00293 |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5 acres, this one is smaller than 57% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jaspal Bangar, Ludhiana (West), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s Vee Kay Concast Pvt Ltd. — lapsed, 300 m away
- Proposed New Steel manufacturing unit having capacity 2,20,500 TPA of Steel… — lapsed, 900 m away
- Industrial project by M/s Garg Furnace Limited — cleared for impact study, 1.8 km away
- Diversion of 0.0383 Ha of Forest Land for Approach Road to Proposed Commercial… — more information requested, 2 km away
- Approach road to proposed retail outlet of HPCL — forest land use approved, 2.1 km away
- Diversion of 0.0380 Ha. of forest land for approach road to retail outlet of… — more information requested, 2.2 km away
- Road project by Inderjit Marwaha Autos Pvt. Ltd — forest land use approved, 2.3 km away
- Road project by Inderjit Marwaha Autos Pvt. Ltd — lapsed, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.