Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Mar 2023 |
| Application filed | 7 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Ativeer Polychem |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹4.7 crore |
| Village / locality | Dhadiala |
| Taluk / tehsil | Dasua |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00341 |
In context
21 applications in Hoshiarpur since January 2022 are in the same category (Industry): 13 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 90% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhadiala, Dasua, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed"The Walking Street" Belonging to Amaze Infra — lapsed, 1.3 km away
- "The Walking Street" Belonging to AMAZE INFRA — lapsed, 1.3 km away
- IOCL Amrit Petroleum Connectivity — lapsed, 1.9 km away
- Diversion of 0.0347hectare forest land for Laying of 150MMØ Carbon Steel Gas… — lapsed, 2 km away
- Proposed Commercial Colony "T-Square" For M/S Crossroads Developers — forest land use approved, 2.2 km away
- Diversion of 0.1973 Hectare of Protected Forest land for laying 125 mm dia PE… — more information requested, 3.1 km away
- Consumer Pump — forest land use approved, 3.8 km away
- Approach road for proposed Retail outlet by IOCL — forest land use approved, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.