Project details
| Official title | The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From Agricultural Land in Village- Nangal Kalmot (Part-1), Tehsil- Nangal, District- Rupnagar, State Punjab From an Area 68.79 Ha, With Avg. Production Capacity 430507 Tpa Proposed by Executive Engineer/ Rupnagar, Drainage Cum Mines and Geology, Wrd, Punjab. |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Aug 2024 |
| Application filed | 31 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Department of Irrigation |
| Land area | 170 acres (68.8 ha) |
| Project cost | ₹32 lakh |
| Village / locality | Kalewal |
| Taluk / tehsil | Garhshankar |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00478 |
In context
37 applications in Hoshiarpur since January 2022 are in the same category (Mining): 24 approved, 2 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 170 acres, this one is larger than 97% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kalewal, Garhshankar, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by Gaj Retreat PVT LTD — lapsed, 3.5 km away
- Urgent Request for Approval for Desilting and Restoration of Check Dams — lapsed, 5.2 km away
- Maintenance, Desilting & Restoration of three existing Check Dams Constructed… — lapsed, 5.3 km away
- Bhullar Valley "ECO HUTS" — lapsed, 6.2 km away
- Bhullar Valley "ECO HUTS" — lapsed, 6.2 km away
- Fuel station by Rajiv Gandhi LPG Vitrak (RGGLV) of Hindustan Petroleum… — lapsed, 7.1 km away
- Diversion of forest land Delisted from PLPA 1900 for construction of M/s… — lapsed, 7.7 km away
- Kamakhya Devi Stone Crusher — lapsed, 8.3 km away
More from Department of Irrigation in Hoshiarpur
- Diversion of 0.4445 Ha. of Forest Land for the Approach/Access for the Purpose… — forest land use approved
- Diversion of 0.9993 Ha. of Forest Land for the Approach/Access for the Purpose… — lapsed
- Gaining Access to the Site of Nara Dam's Reservoir by Diversion of Forest Land… — lapsed
- Gaining Access to the Site of Patiari Dam's Reservoir by Diversion of Forest… — forest land use approved
- Diversion of 0.99 Ha. of Forest Land for the Approach/Access for the Purpose… — lapsed
- Re-Diversion of Nara Dam's Already Diverted Reservoir Area for the Purpose of… — lapsed
19 Department of Irrigation, Punjab projects in Hoshiarpur
All 157 Department of Irrigation, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.