Quick answers
What is AH Alloys?
AH Alloys is a lapsed industrial project in Ludhiana, Ludhiana (West), Punjab. The site covers 2.5 acres.
Who is building it?
The applicant is Happy Gupta.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Ludhiana, Ludhiana (West), Punjab.
How big is it?
It has a stated cost of ₹10 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 27 May 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 27 May 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Happy Gupta |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹10 crore |
| Village / locality | Ludhiana |
| Taluk / tehsil | Ludhiana (West) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00501 |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 80% of them.
48 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ludhiana, Ludhiana (West), Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s Sharu Special Alloys Private Limited — cleared for impact study, 600 m away
- Road project by Inderjit Marwaha Autos Pvt. Ltd — forest land use approved, 850 m away
- Road project by Inderjit Marwaha Autos Pvt. Ltd — lapsed, 850 m away
- Expansion in existing Steel Manufacturing unit having existing capacity 25,200… — lapsed, 950 m away
- Expansion in existing Steel Manufacturing unit having existing capacity 25,200… — environmental approval granted, 950 m away
- Fuel station by M/s Bharat Petroleum Corporation limited — forest land use approved, 950 m away
- Fuel station by M/s Bharat Petroleum Corporation limiteda at Village Dhandari… — lapsed, 950 m away
- Industrial project by B P Alloys Limited — lapsed, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.