What is this project?
Expansion in existing Steel manufacturing unit having capacity 29,400 TPA of Steel Ingots, Angle, Channels, Rounds, Square, TMT Bars, Flats, Patra by replacing existing Induction Furnace of 7TPH capacity with new Induction Furnace having capacity 20 TPH, Laddle Refining Furnace of 20 TPH and a Concast at G.T. road, Sirhind Side, Behind Modern Steel Ltd., Mandi Gobindgarh, Tehsil-Amloh, District-Fatehgarh Sahib, Punjab by M/s Kuber Casting Pvt. Ltd is an approved industrial project in Talwara, Amloh, Fatehgarh Sahib, Punjab. The site covers 4.5 acres.
Who is building it?
The applicant is Kuber Casting Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Apr 2024), as of 27 Nov 2026.
Where is it?
In Talwara, Amloh, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹13.1 crore and a site of 4.5 acres.
When was it filed?
The application was filed on 29 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Apr 2024 |
| Application filed | 29 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Kuber Casting Private Limited |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹13.1 crore |
| Village / locality | Talwara |
| Taluk / tehsil | Amloh |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site area on record |
| Our reference | WID-PB-00515 |
In context
85 applications in Fatehgarh Sahib since January 2022 are in the same category (Industry): 70 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.5 acres, this one is smaller than 59% of them.
73 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Talwara, Amloh, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Steel Manufacturing Unit M/s Lord Mahaveer Industries… — environmental approval granted, 350 m away
- Amendment in the EC granted vide No. EC22B008PB110354 Dated 19.01.2022 by… — environmental approval granted, 400 m away
- Existing Steel Manufacturing Unit namely "M/s Oasis Enterprises Pvt Ltd." — lapsed, 400 m away
- Amendment in the Ec Vide No. Ec23b1010pb5745968n Dated 19.04.2024 of Unit M/S… — environmental approval granted, 550 m away
- Expansion in the existing Steel Manufacturing Unit M/s Fortune Metals Limited… — environmental approval granted, 550 m away
- Expansion in the existing Steel Manufacturing Unit M/s Fortune Metals Limited… — cleared for impact study, 550 m away
- Manufacturing of 1,57,500 TPA of Steel Ingots/billets and 1,40,000TPA of… — environmental approval granted, 600 m away
- Permission for construction of approach Access to M/S PUNJAB FORGING… — forest land use approved, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.