Quick answers
What is CM Valley?
CM Valley is an approved residential project in Jainpur, Ludhiana (West), Ludhiana, Punjab. It plans 220 units on 5.7 acres.
Who is building it?
The applicant is Cm Luxury Homes.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Jul 2024), as of 27 Nov 2026.
Where is it?
In Jainpur, Ludhiana (West), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹197 crore and a site of 5.7 acres.
When was it filed?
The application was filed on 13 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Jul 2024 |
| Application filed | 13 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Cm Luxury Homes |
| Use | Residential |
| Units | 220 |
| Land area | 5.7 acres (2.3 ha) |
| Built-up area | 1,48,577 m² (15,99,268 sq ft) |
| Plot area | 23,108 m² (2,48,732 sq ft) |
| Project cost | ₹197 crore |
| Village / locality | Jainpur |
| Taluk / tehsil | Ludhiana (West) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00622 |
What the filings say
What is planned
CM Luxury Homes proposes the development of a group housing project named "CM Valley" in Jainpur, Ludhiana. The applicant's project report states that the development will consist of 220 flats across a built-up area of 1,48,577 square metres. The project is designed to accommodate an estimated population of 1,210 persons.
According to the layout plans, the residential units are distributed across multiple blocks:
- Block A: 40 flats (Stilt + 10 floors)
- Block B: 40 flats (Stilt + 10 floors)
- Block C: 40 flats (Stilt + 10 floors)
- Block D: 40 flats (Stilt + 10 floors)
- Block E: 40 flats (Stilt + 10 floors)
- Block F: 20 flats (Stilt + 10 floors)
The project also includes a club building on the ground floor.
Layout and design
The total site area is 2.31 hectares (5.71 acres). The layout plan specifies a ground coverage area of 6,642.735 square metres. The design incorporates a central green area and a peripheral green belt. Internal circulation is facilitated by a 36-foot (198-inch) wide road connecting to the Jalandhar road. Surface parking and underground parking facilities are planned to accommodate vehicles.
Water, power and access
The total domestic water requirement is estimated at 151 kilolitres per day (KLD). The applicant plans to source 100 KLD of fresh water from groundwater. During the construction phase, treated wastewater will be sourced from the Municipal Corporation Ludhiana's sewage treatment plant (STP).
For the operational phase, an on-site STP with a capacity of 180 KLD will be installed. The water balance indicates that 121 KLD of wastewater will be generated, with treated water reused for flushing (51 KLD) and landscaping (39 KLD in summer). Excess treated water (ranging from 31 KLD in summer to 66 KLD in the rainy season) will be discharged into the public sewer.
Power requirement is estimated at 1,250 KW, to be sourced from the state grid. To manage power outages, the project will install four Diesel Generator (DG) sets: two of 125 KVA and two of 240 KVA.
Environmental safeguards
The applicant has earmarked 7,037 square metres for green development, which includes the plantation of 663 trees. To manage stormwater, six rainwater harvesting pits are proposed. The annual rainfall potential for the site is calculated at 10,073 cubic metres.
Solid waste generation is estimated at 462 kg per day. This will be segregated into bio-degradable waste (185 kg), recyclable waste (185 kg), and inert or e-waste (92 kg). A mechanical composter with a capacity of 200 kg per day will be installed for organic waste, while recyclables and e-waste will be handed over to authorized recyclers. Hazardous waste, primarily 50-100 litres of used oil per annum from DG sets, will be sold to authorized recyclers.
Energy conservation measures include the use of LED lamps for common areas and solar-powered street lighting. The applicant estimates a total energy saving of 408 KWHD per day through these measures.
| Item | Detail |
|---|---|
| Total Built-up Area | 1,48,577 sqm |
| Total Residential Units | 220 Flats |
| Estimated Population | 1,210 Persons |
| STP Capacity | 180 KLD |
| Fresh Water Requirement | 100 KLD |
| Solid Waste Generation | 462 Kg/Day |
| Green Area | 7,037 sqm (30.4%) |
| Rainwater Harvesting Pits | 6 Nos |
| Power Load | 1,250 KW |
CM Valley site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
158 applications in Ludhiana since January 2022 are in the same category (Buildings & townships): 113 approved, 16 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.7 acres, this one is smaller than 71% of them.
69 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jainpur, Ludhiana (West), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- CM Luxury Homes — environmental approval granted, 0 m away
- CM Luxury Homes — cleared for impact study, 0 m away
- RESIDENTIAL PLOTTED COLONY NAMELY "MAURYA GREENS" By M/s EK DEVELOPERS PRIVATE… — environmental approval granted, 700 m away
- Hospital Project (5.11 Acres) by M/s Sanmo Estates Private Limited — environmental approval granted, 700 m away
- Commercial colony named "Bagh – E – Khas" to be developed by "Richville Infra… — forest land use approved, 700 m away
- Road project by M/S Sanmo Estates Pvt. Ltd., at Village Malakpur, Tehsil… — forest land use approved, 700 m away
- Upgradation, Widening and strengthening the road from Laddowal Bypass to… — more information requested, 1 km away
- Expansion of Group Housing Project namely "Eastwood Crest" by M/s Eastwood CB… — cleared for impact study, 1 km away
More from Cm Luxury Homes in Ludhiana
- CM Luxury Homes — environmental approval granted
- CM Luxury Homes — cleared for impact study
All 3 Cm Luxury Homes projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.