Quick answers
What is this project?
Expansion in the Steel Manufacturing Unit From 84,000tpa to 3,57,000tpa of Steel Ingots/Billets & 35,000tpa to 3,39,150tpa of Tmt Bars, Flat/Round Tmt Bars, Structure Steel by Replacing 01 No. of Existing I.F. of Capacity 20 Tph With 02 No. of Induction Furnaces Having Capacity 30 Tph Each and Addition of 01 No. of Reheating Furnace to the Existing One of Capacity 25 Tph by M/S Kay Ell Dee Metaliks PVT. LTD. Located at Vill Ambey Majra, Mandi Gobindgarh, Teh- Amloh, Distt Fatehgarh Sahib,punjab is a proposed industrial project in Ambe Mazra, Amloh, Fatehgarh Sahib, Punjab. The site covers 13.4 acres.
Who is building it?
The applicant is M/S Kay Ell Dee Metaliks PVT. LTD..
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 Jun 2024), as of 27 Nov 2026.
Where is it?
In Ambe Mazra, Amloh, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹79.3 crore and a site of 13.4 acres.
When was it filed?
The application was filed on 30 May 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 Jun 2024 |
| Application filed | 30 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S Kay Ell Dee Metaliks PVT. LTD. |
| Land area | 13.4 acres (5.4 ha) |
| Project cost | ₹79.3 crore |
| Village / locality | Ambe Mazra |
| Taluk / tehsil | Amloh |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00623 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 4 Feb 2026 | Lapsed | 13.4 acres | ₹79.3 crore |
| Early planning filed 30 May 2024 (this page) | Cleared for impact study | 13.4 acres | ₹79.3 crore |
In context
85 applications in Fatehgarh Sahib since January 2022 are in the same category (Industry): 70 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13.4 acres, this one is larger than 91% of them.
73 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambe Mazra, Amloh, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for transfer of Term of References (ToR) in the name of Industry… — withdrawn, 0 m away
- Expansion in the Steel Manufacturing Unit From 84,000tpa to 3,57,000tpa of… — lapsed, 0 m away
- Application for transfer of Environmental clearance (EC) in the name of… — environmental approval granted, 50 m away
- Industrial project by M/S.Bhawani Castings (P) Limited — environmental approval granted, 200 m away
- Expansion in the Steel Manufacturing Unit From 72,000 Tpa to 1,76, 750 Tpa of… — withdrawn, 200 m away
- Industrial project by M/S.Bhawani Castings (P) Limited — cleared for impact study, 200 m away
- Expansion of existing Steel Manufacturing Unit namely M/s Jagat Metals Pvt. Ltd — environmental approval granted, 400 m away
- Expansion of existing Steel Manufacturing Unit namely M/s Jagat Metals Pvt. Ltd — cleared for impact study, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.