What is Developing? Open the mapMap

Not approvedBuildings & townships · Ludhiana, Punjab

Rajgarh Estate Phase-Ii & Phase-Ii Ext.

Rajgarh Estate Phase-Ii & Phase-Ii Ext is a rejected township project in Birmi, Ludhiana (West), Ludhiana, Punjab. The site covers 64.9 acres. Its stated project cost is ₹131.1 crore. As of 27 Nov 2026, its status is “Not approved” (since 12 Jul 2024).

See it on the live map All projects in Ludhiana

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Rajgarh Estate Phase-Ii & Phase-Ii Ext.?

Rajgarh Estate Phase-Ii & Phase-Ii Ext is a rejected township project in Birmi, Ludhiana (West), Ludhiana, Punjab. The site covers 64.9 acres.

Who is building it?

The applicant is Dev Arjuna Promoters and Developers Private Limited.

Has it been approved?

No. The application was rejected on 12 Jul 2024.

Where is it?

In Birmi, Ludhiana (West), Ludhiana, Punjab.

How big is it?

It has a stated cost of ₹131.1 crore and a site of 64.9 acres.

When was it filed?

The application was filed on 27 Mar 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Rajgarh Estate Phase-Ii & Phase-Ii Ext.

Project details

StatusNot approved
Status since12 Jul 2024
Application filed27 Mar 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantDev Arjuna Promoters and Developers Private Limited
UseTownship
Land area64.9 acres (26.3 ha)
Project cost₹131.1 crore
Village / localityBirmi
Taluk / tehsilLudhiana (West)
DistrictLudhiana
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-00666

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 27 Mar 2024 (this page)Not approved64.9 acres₹131.1 crore
Early planning filed 7 Sept 2023Cleared for impact study64.9 acres₹131.1 crore

What the filings say

What is planned

Dev Arjuna Promoters and Developers Private Limited is proposing an expansion of its residential project, Rajgarh Estate (also referred to as Rajgadh Estate), located in Village Birmi, Ludhiana. The project is classified as a township and area development project.

The expansion will increase the total land area from an existing 14.39 hectares (35.56 acres) to 26.27 hectares (64.9 acres). The total built-up area will expand from 89,839.92 square metres to 3,29,926 square metres.

According to the applicant's Environmental Impact Assessment (EIA) report, the completed project will include:

The project is designed to accommodate a projected population of 8,685 persons. The total project cost is estimated at ₹131.05 crore.

Layout and design

The layout plan was approved by the Chief Town Planner, Chandigarh, and the Greater Ludhiana Area Development Authority (GLADA). The project is situated in a low-density residential area as per the Ludhiana Master Plan.

The design incorporates a green area of 15,023 square metres. The internal road network is designed for "tension-free traffic" with a 24.38-metre (80-foot) wide approach road. The maximum height of the building blocks is restricted to 39.6 metres, though a No Objection Certificate from the Ministry of Defence allows for heights up to 60 metres above ground level.

Land and surroundings

The site is located at Village Birmi, Tehsil Ludhiana (West), approximately 1.25 km from National Highway 5. The Ludhiana Railway Station is 10.6 km away. The land is flat and was previously used for agriculture before obtaining Change of Land Use (CLU) permissions.

Environmental surveys indicate the Sidhwan Canal is located 0.53 km from the site, and the Satluj River is 8.31 km away. No wildlife sanctuaries, national parks, or protected forests are reported within a 10 km radius of the project site.

Water, power and access

The total water requirement for the expanded project is estimated at 1,038 kilolitres per day (KLD), which will be met through groundwater. The applicant has applied for permission from the Central Ground Water Authority (CGWA) for this abstraction.

Domestic sewage generation is projected at 830 KLD. This will be treated in a Sewage Treatment Plant (STP) with a total capacity of 900 KLD (comprising two existing 250 KLD units and one proposed 400 KLD unit) using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing and irrigation of green areas. Any surplus treated wastewater is proposed to be utilized for irrigation on 2.02 hectares (5 acres) of land using 'Karnal Technology'.

Power requirements are estimated at 6,000 kW, to be supplied by the state power corporation. Two diesel generator sets (63 kVA and 180 kVA) are planned for backup power.

Environmental safeguards

The applicant has proposed an Environmental Management Plan (EMP) with a capital expenditure of ₹4.45 crore during the construction phase and an annual recurring cost of ₹66 lakh during the operation phase.

Key safeguards include:

Timeline

The applicant states that construction will commence only after obtaining Environmental Clearance. The baseline environmental studies for the expansion were conducted between 15 September 2023 and 15 December 2023. A proposed timeline for Additional Environmental Responsibility (CER) activities extends up to 1.5 years from the date of the grant of Environmental Clearance.

Rajgarh Estate Phase-Ii & Phase-Ii Ext. site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Rajgarh Estate Phase-Ii & Phase-Ii Ext.: Proposed zoning plan: residential plots, group housing, school and commercial sites (preview)🔒 Sign in free to see it
Proposed zoning plan: residential plots, group housing, school and commercial sites
Rajgarh Estate Phase-Ii & Phase-Ii Ext.: Site layout plan showing phase-wise boundaries and internal road network (preview)🔒 Sign in free to see it
Site layout plan showing phase-wise boundaries and internal road network
Rajgarh Estate Phase-Ii & Phase-Ii Ext.: Project location marked on the Ludhiana Master Plan (preview)🔒 Sign in free to see it
Project location marked on the Ludhiana Master Plan
Rajgarh Estate Phase-Ii & Phase-Ii Ext.: Land use and land cover map of the 10 km study area radius (preview)🔒 Sign in free to see it
Land use and land cover map of the 10 km study area radius

In context

158 applications in Ludhiana since January 2022 are in the same category (Buildings & townships): 113 approved, 16 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 64.9 acres, this one is larger than 77% of them.

101 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Birmi, Ludhiana (West), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dev Arjuna Promoters and Developers Private Limited in Ludhiana

All 4 Dev Arjuna Promoters projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.