Quick answers
What is GRAVEL MINING PROJECT (CRMS-55), Area-2.23?
GRAVEL MINING PROJECT (CRMS-55), Area-2.23 is an approved mining project in Jiumber Traf Naroy, Pathankot, Punjab. The site covers 5.5 acres.
Who is building it?
The applicant is Daljit Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Dec 2025), as of 27 Nov 2026.
Where is it?
In Jiumber Traf Naroy, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹3 lakh and a site of 5.5 acres.
When was it filed?
The application was filed on 25 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Dec 2025 |
| Application filed | 25 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Daljit Singh |
| Land area | 5.5 acres (2.2 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Jiumber Traf Naroy |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00788 |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 5.5 acres, this one is smaller than 75% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 40 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 51 mining leases have applied within 5 km.
Where it is
Jiumber Traf Naroy, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (Gravel) of Mining Project — environmental approval granted, 250 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 300 m away
- Proposed Minor Mineral (Gravel) Mining Project for obtaining Terms of… — under environmental review, 400 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 450 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 450 m away
- Obtaining Term of Reference of mining of minor mineral i.e. Gravel — environmental approval granted, 600 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 650 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.