Quick answers
What is this project?
Residential Plotted Colony namely "Florence" By M/s New Vision Land Developers LLP is an approved residential project in Bagga Kalan, Ludhiana (West), Ludhiana, Punjab. It plans 102 units on 19 acres.
Who is building it?
The applicant is New Vision Land Developers LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Dec 2025), as of 27 Nov 2026.
Where is it?
In Bagga Kalan, Ludhiana (West), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹9.8 crore and a site of 19 acres.
When was it filed?
The application was filed on 4 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Dec 2025 |
| Application filed | 4 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | New Vision Land Developers LLP |
| Use | Residential |
| Units | 102 |
| Parking spaces | 38 |
| Land area | 19 acres (7.7 ha) |
| Built-up area | 94,303 m² (10,15,068 sq ft) |
| Plot area | 77,016 m² (8,28,993 sq ft) |
| Project cost | ₹9.8 crore |
| Village / locality | Bagga Kalan |
| Taluk / tehsil | Ludhiana (West) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00823 |
What the filings say
What is planned
M/s New Vision Land Developers LLP proposes to develop a residential plotted colony named "Florence" on 7.7 hectares (19.031 acres) of land. According to the applicant's conceptual plan, the project will feature 102 residential plots of varying sizes. The development includes designated areas for Economically Weaker Section (EWS) housing, commercial facilities, a school, and a clubhouse. The total built-up area for the project is estimated at 94,302.66 sqm.
| Item | Detail |
|---|---|
| Total Plots | 102 |
| Total Built-up Area | 94,302.66 sqm |
| Green Area | 5,339.13 sqm (7.3%) |
| Total Water Requirement | 306 KLD |
| STP Capacity | 300 KLD |
| Power Demand | 1,500 KW |
| Estimated Population | 3,313 |
| Solid Waste Generation | 1,093 kg/day |
Layout and design
The project design incorporates a green belt and parks covering approximately 5,339.13 sqm, representing 7.3% of the total site area. The internal road network and open spaces account for 23,513.61 sqm (32.18%). For the commercial zone, the applicant has planned a parking area of 874.40 sqm, providing 38 Equivalent Car Space (ECS) slots. The residential parking will be managed by individual plot owners within their respective premises.
Water, power and access
The total water requirement during the operation phase is projected at 306 kilolitres per day (KLD). The applicant intends to meet the fresh water demand of 198 KLD through groundwater sources. The remaining 108 KLD required for flushing will be sourced from treated wastewater. During the construction phase, water will be supplied via tankers, with an estimated 5 KLD for domestic use and 10 KLD for construction activities.
The maximum power demand is estimated at 1,500 KW, to be supplied by Punjab State Power Corporation Limited (PSPCL). For emergency backup, the applicant proposes to install two DG sets with capacities of 125 kVA and 250 kVA. The project site is situated near the Ladhowal bypass road (0.1 km) and National Highway 44 (4.97 km).
Environmental safeguards
A Sewage Treatment Plant (STP) with a capacity of 300 KLD is proposed, utilizing Moving Bed Biofilm Reactor (MBBR) technology followed by ultra-filtration. Treated wastewater will be reused for flushing and landscaping (29.36 KLD during summer). Surplus treated water will be discharged onto land using Karnal technology.
Solid waste generation is estimated at 1,093 kg/day. The applicant plans to install a mechanized composter with a capacity of 600 kg/day to process biodegradable waste into manure for use in the green areas. Non-biodegradable recyclable waste will be sold to authorized recyclers. For storm water management, seven rain water harvesting pits with dual bores are planned to recharge groundwater.
Timeline
The development period for the colony is expected to range between one and four years. During the construction phase, approximately 70 labourers will be employed, sourced from local areas.
New Vision Land Developers Residential Plotted Colony Namely "Florence" site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
158 applications in Ludhiana since January 2022 are in the same category (Buildings & townships): 113 approved, 16 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19 acres, this one is larger than 63% of them.
46 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bagga Kalan, Ludhiana (West), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Group Housing project namely "The Cambium" by M/s Worldnext Realty LLP — environmental approval granted, 500 m away
- Proposed Group Housing project namely "The Cambium" by M/s Worldnext Realty LLP — cleared for impact study, 500 m away
- Residential Plotted Project "Sun View Harmony" by M/s FUTURAMA INFRA LLP — environmental approval granted, 1.1 km away
- Residential Plotted Project "Sun View Harmony" by M/s FUTURAMA INFRA LLP — cleared for impact study, 1.1 km away
- Residential Plotted Project "Sun View Harmony" by M/s FUTURAMA INFRA LLP — cleared for impact study, 1.1 km away
- Minor Mineral (Sand) Mining Project for obtaining Environmental Clearance, of… — environmental approval granted, 2 km away
- CM Luxury Homes — environmental approval granted, 2.1 km away
- CM Luxury Homes — cleared for impact study, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.