Quick answers
What is Sand Mining Project?
Sand Mining Project is an approved mining project in Baghela, Nakodar, Jalandhar, Punjab. The site covers 27.7 acres.
Who is building it?
The applicant is Rajinder Infrastructure Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Jan 2026), as of 27 Nov 2026.
Where is it?
In Baghela, Nakodar, Jalandhar, Punjab.
How big is it?
It has a stated cost of ₹4.6 crore and a site of 27.7 acres.
When was it filed?
The application was filed on 26 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jan 2026 |
| Application filed | 26 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Rajinder Infrastructure Private Limited |
| Land area | 27.7 acres (11.2 ha) |
| Project cost | ₹4.6 crore |
| Village / locality | Baghela |
| Taluk / tehsil | Nakodar |
| District | Jalandhar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00839 |
In context
46 applications in Jalandhar since January 2022 are in the same category (Mining): 25 approved, 14 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.7 acres, this one is larger than 63% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 55.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Baghela, Nakodar, Jalandhar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Umrewal and Baghela Sand Mining Project, Executive Engineer/Jalandhar,… — environmental approval granted, 0 m away
- Umrewal and Baghela Sand Mining Project, Executive Engineer/Jalandhar,… — cleared for impact study, 50 m away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — environmental approval granted, 850 m away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — under environmental review, 850 m away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — environmental approval granted, 1.1 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — under environmental review, 1.1 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — environmental approval granted, 1.3 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — under environmental review, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.