Quick answers
What is this project?
Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference , located near Village- Siunti Taraf Narot, District Pathankot, Punjab CRMS-78 lease area of 2.84 ha in favor of Raman Kumar Sharma is a proposed mining project in Jiumber Traf Naroy, Pathankot, Punjab. The site covers 7 acres.
Who is building it?
The applicant is Raman Kumar Sharma.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Dec 2025), as of 27 Nov 2026.
Where is it?
In Jiumber Traf Naroy, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹4 lakh and a site of 7 acres.
When was it filed?
The application was filed on 5 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference , located near…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Dec 2025 |
| Application filed | 5 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Raman Kumar Sharma |
| Land area | 7 acres (2.8 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Jiumber Traf Naroy |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00841 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Apr 2026 | Environmental approval granted | 7 acres | ₹4 lakh |
| Early planning filed 5 Dec 2025 (this page) | Cleared for impact study | 7 acres | ₹4 lakh |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 7 acres, this one is smaller than 66% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 46.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 52 mining leases have applied within 5 km.
Where it is
Jiumber Traf Naroy, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference ,… — environmental approval granted, 0 m away
- Minor Mineral (Gravel) Mining Project (CRMS No. 42), Khasra Nos. 33//6, 13/2,… — environmental approval granted, 350 m away
- Minor Mineral (Gravel) Mining Project (CRMS No. 42), Khasra Nos. 33//6, 13/2,… — cleared for impact study, 350 m away
- Minor Mineral (Gravel) Mining Project (CRMS No. 42), Khasra Nos. 33//6, 13/2,… — withdrawn, 350 m away
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference ,… — environmental approval granted, 400 m away
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference ,… — cleared for impact study, 400 m away
- Obtaining Environmental Clearance of the Minor mineral (Gravel) of mining… — environmental approval granted, 450 m away
- Minor mineral i.e. Gravel — withdrawn, 450 m away
More from Raman Kumar Sharma in Pathankot
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference ,… — environmental approval granted
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference ,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.