Project details
| Official title | Proposed establishment of Resin Manufacturing Unit Within the Existing Plyboard Manufacturing plant by M/s Wintek Boards Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Mar 2026 |
| Application filed | 24 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Wintek Boards Private Limited |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Basi Maruf |
| Taluk / tehsil | Hoshiarpur |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00942 |
In context
21 applications in Hoshiarpur since January 2022 are in the same category (Industry): 13 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.2 acres, this one is smaller than 76% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Basi Maruf, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Formaldehyde and Resin Manufacturing Unit — cleared for impact study, 250 m away
- Resin Manufacturing Unit Within the Existing Ply-board manufacturing… — environmental approval granted, 600 m away
- Proposed Veneer and Plywood manufacturing unit by M/s Century Plyboards… — environmental approval granted, 2.1 km away
- Resin Manufacturing facility within the Existing Plywood Manufacturing Unit by… — initial checks, 2.1 km away
- Resin Manufacturing Unit Within the Existing Ply-board manufacturing… — environmental approval granted, 2.4 km away
- Resin Manufacturing facility within the existing Plywood Manufacturing Unit by… — initial checks, 2.5 km away
- Resin Manufacturing Facility Within the Existing Ready Laminate Sheet… — initial checks, 2.6 km away
- Proposed Greenfield Formaldehyde (72000 MTPA) and Resin (82,8000 MTPA)… — cleared for impact study, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.