What is Developing? Open the mapMap

Cleared for impact studyIndustry · Ludhiana, Punjab

Proposed Resin & Glue manufacturing plant of capacity 100 TPD by M/s Sterling Industries located at Plot C8, Focal Point, Industrial Area Raikot, District Ludhiana, Punjab.

Proposed Resin & Glue manufacturing plant of capacity 100 TPD by M/s Sterling Industries located at Plot C8, Focal Point, Industrial Area Raikot, District Ludhiana, Punjab is a proposed industrial project in Raikot, Ludhiana, Punjab. The site covers 0.2 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 27 Jun 2025).

See it on the live map All projects in Ludhiana

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Resin & Glue manufacturing plant of capacity 100 TPD by M/s Sterling Industries located at Plot C8, Focal Point, Industrial Area Raikot, District Ludhiana, Punjab is a proposed industrial project in Raikot, Ludhiana, Punjab. The site covers 0.2 acres.

Who is building it?

The applicant is Sterling Industries.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 27 Jun 2025), as of 27 Nov 2026.

Where is it?

In Raikot, Ludhiana, Punjab.

How big is it?

It has a stated cost of ₹1.1 crore and a site of 0.2 acres.

When was it filed?

The application was filed on 24 Jun 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Resin & Glue manufacturing plant of capacity 100 TPD by M/s Sterling Industries…

Project details

StatusCleared for impact study
Status since27 Jun 2025
Application filed24 Jun 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSterling Industries
Land area800 m²
Project cost₹1.1 crore
Village / localityRaikot
Taluk / tehsilRaikot
DistrictLudhiana
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-00958

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Dec 2025Environmental approval granted0.2 acres₹1.1 crore
Early planning filed 24 Jun 2025 (this page)Cleared for impact study0.2 acres₹1.1 crore

In context

98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 100% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Raikot, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Sterling Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.