Quick answers
What is this project?
Amendment in Environmental Clearance (EC) granted to Integrated Industrial Estates project namely "Hi Tech Cycle Valley" by Punjab Small Industries & Export Corp. Ltd. Chandigarh is an approved industrial project in Baunkran, Ludhiana (East), Ludhiana, Punjab. The site covers 378.8 acres.
Who is building it?
The applicant is Punjab Small Industries and Export Corporation LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Jun 2025), as of 27 Nov 2026.
Where is it?
In Baunkran, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹275.6 crore and a site of 378.8 acres.
When was it filed?
The application was filed on 24 Mar 2025.
Project details
| Official title | Amendment in Environmental Clearance (EC) granted to Integrated Industrial Estates project namely "Hi Tech Cycle Valley" in the revenue estate of Village Dhanansu, Tehsil Ludhiana East, District Ludhiana Punjab by Punjab Small Industries & Export Corp. Ltd. Chandigarh |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Jun 2025 |
| Application filed | 24 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Punjab Small Industries and Export Corporation LTD |
| Land area | 378.8 acres (153.3 ha) |
| Project cost | ₹275.6 crore |
| Village / locality | Baunkran |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00972 |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 378.8 acres, this one is larger than 98% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baunkran, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project (Boulder, Gravel, Sand), As Per Dsr No.… — environmental approval granted, 1.2 km away
- Mining of Minor Minerals (Sand) on Agricultural Land — lapsed, 4.7 km away
- Expansion in existing Steel Manufacturing unit having existing capacity 26,950… — withdrawn, 5.3 km away
- Expansion in the existing steel manufacturing unit having existing capacity… — lapsed, 5.3 km away
- Expansion in the existing steel manufacturing unit having existing capacity… — cleared for impact study, 5.3 km away
- Expansion in the existing steel manufacturing unit having existing capacity… — cleared for impact study, 5.3 km away
- Application for issuance of Terms of Reference (TORs) for the existing unit… — lapsed, 5.3 km away
- Industrial project by Premia Chemicals Private Limited — lapsed, 5.8 km away
All 3 Punjab Small Industries and Export Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.