Quick answers
What is this project?
Expansion of the Existing Chloro Alkali Plant for Increase in the Production Capacity of Caustic Soda From 250 Tpd to 300 Tpd and Other Products Correspondingly by M/S Bodal Chemicals Limited is an approved industrial project in Dabanheri, Rajpura, Patiala, Punjab. The site covers 123.7 acres.
Who is building it?
The applicant is Bodal Chemicals Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 May 2026), as of 27 Nov 2026.
Where is it?
In Dabanheri, Rajpura, Patiala, Punjab.
How big is it?
It has a stated cost of ₹395 crore and a site of 123.7 acres.
When was it filed?
The application was filed on 7 Mar 2026.
Project details
| Official title | Expansion of the Existing Chloro Alkali Plant for Increase in the Production Capacity of Caustic Soda From 250 Tpd to 300 Tpd and Other Products Correspondingly by M/S Bodal Chemicals Limited Located in the Revenue Estate of Village-Khadauli/Sardargarh, Rajpura, Patiala-140401 |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 May 2026 |
| Application filed | 7 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Bodal Chemicals Limited |
| Land area | 123.7 acres (50.1 ha) |
| Project cost | ₹395 crore |
| Village / locality | Dabanheri |
| Taluk / tehsil | Rajpura |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01105 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 7 Mar 2026 (this page) | Environmental approval granted | 123.7 acres | ₹395 crore |
| New project filed 30 Jan 2025 | Environmental approval granted | 123.7 acres | ₹395 crore |
| Early planning filed 4 Mar 2024 | Cleared for impact study | 123.7 acres | ₹395 crore |
In context
45 applications in Patiala since January 2022 are in the same category (Industry): 29 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 123.7 acres, this one is larger than 87% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dabanheri, Rajpura, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — environmental approval granted, 0 m away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — cleared for impact study, 0 m away
- Proposed Industrial Unit for Manufacturing of Chlorinated Methyl Fatty Ester… — environmental approval granted, 300 m away
- Industrial project by M/s Shivtek Spechemi Industries Ltd. — cleared for impact study, 300 m away
- Industrial project by M/s Shivtek Spechemi Industries Limited — returned to applicant, 300 m away
- Proposed Industrial Unit for Manufacturing of Chlorinated Methyl Fatty Ester… — cleared for impact study, 300 m away
- Expansion in existing unit for increase in the production of Chlorinated… — environmental approval granted, 300 m away
- Expansion in existing unit for increase in the production of Chlorinated… — cleared for impact study, 300 m away
3 Bodal Chemicals projects in Patiala
All 12 Bodal Chemicals projects across India