Quick answers
What is this project?
Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references, located near Village- Dalpat District Pathankot, Punjab with Had bast No.79 and a lease area of 2.23 ha CRMS 77 in favor of Mr, Paras Oberoi is a proposed mining project in Jiumber Traf Naroy, Pathankot, Punjab. The site covers 5.5 acres.
Who is building it?
The applicant is Paras Oberoi.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Jiumber Traf Naroy, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹1 crore and a site of 5.5 acres.
When was it filed?
The application was filed on 10 Jul 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 14 Jul 2026 |
| Application filed | 10 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Paras Oberoi |
| Land area | 5.5 acres (2.2 ha) |
| Project cost | ₹1 crore |
| Village / locality | Jiumber Traf Naroy |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01205 |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 5.5 acres, this one is smaller than 75% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 12.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 51 mining leases have applied within 5 km.
Where it is
Jiumber Traf Naroy, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 100 m away
- This is a proposed Minor Mineral (RBM) Mining Project , located near Village-… — under environmental review, 400 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 450 m away
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference ,… — environmental approval granted, 650 m away
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference ,… — cleared for impact study, 650 m away
- Obtaining Environmental Clearance of the Minor mineral (Gravel) of mining… — environmental approval granted, 650 m away
- Minor mineral i.e. Gravel — withdrawn, 650 m away
- Minor Mineral (Gravel) of Mining Project — environmental approval granted, 700 m away
More from Paras Oberoi in Pathankot
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.