Quick answers
What is this project?
Proposed Adhesive manufacturing unit by M/s Nikit Chem Industries Limited is a proposed industrial project in Bhairo Manna, Ludhiana (East), Ludhiana, Punjab. The site covers 2 acres.
Who is building it?
The applicant is Nikit Chem Industries Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 Mar 2026), as of 27 Nov 2026.
Where is it?
In Bhairo Manna, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹19 crore and a site of 2 acres.
When was it filed?
The application was filed on 18 Feb 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Mar 2026 |
| Application filed | 18 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Nikit Chem Industries Limited |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹19 crore |
| Village / locality | Bhairo Manna |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01211 |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 85% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhairo Manna, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.3412 Ha. of Forest Land for Laying of Optical Fiber Cable From… — lapsed, 1000 m away
- Expansion in existing steel manufacturing unit by M/s Renny Strips Ltd — cleared for impact study, 1.4 km away
- Application for transfer of Environmental clearance (EC) in the name of… — environmental approval granted, 1.4 km away
- Industrial project by M/s Renny Strips Pvt Ltd — environmental approval granted, 1.4 km away
- Expansion in the existing Steel Manufacturing unit M/s S.S. Concast Private… — cleared for impact study, 2.1 km away
- 220 KV D/C line from proposed 400 KV S/S Dhanansu to 220 KV S/S Doraha using… — lapsed, 3 km away
- Residential Plotted Colony namely "Palm City Phase II" By M/s Malhotra Land… — environmental approval granted, 3.1 km away
- Residential Plotted Colony namely "Palm City Phase II" By M/s Malhotra Land… — environmental approval granted, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.