Quick answers
What is this project?
Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of Environmental Clearance, located near Village - Chhaula Tehsil - Phillaur, District Jalandhar, Punjab with a lease area of 3.82 ha in favor of S.S Handa Enterprises is a proposed mining project in Phillaur, Jalandhar, Punjab. The site covers 9.4 acres.
Who is building it?
The applicant is Sucha singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Feb 2026), as of 27 Nov 2026.
Where is it?
In Phillaur, Jalandhar, Punjab.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 9.4 acres.
When was it filed?
The application was filed on 8 Jan 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Feb 2026 |
| Application filed | 8 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sucha singh |
| Land area | 9.4 acres (3.8 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Phillaur |
| Taluk / tehsil | Phillaur |
| District | Jalandhar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01283 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 2 Nov 2026 | More information requested | 9.4 acres | ₹1.2 crore |
| New project filed 2 Jun 2026 | Environmental approval granted | 9.4 acres | ₹1.2 crore |
| Early planning filed 8 Jan 2026 (this page) | Cleared for impact study | 9.4 acres | ₹1.2 crore |
In context
46 applications in Jalandhar since January 2022 are in the same category (Mining): 25 approved, 14 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.4 acres, this one is smaller than 74% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 37.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Phillaur, Jalandhar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — more information requested, 0 m away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — environmental approval granted, 0 m away
- Minor Mineral (Sand) Mining Project for obtaining Environmental Clearance,… — withdrawn, 0 m away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — more information requested, 400 m away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — environmental approval granted, 400 m away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — cleared for impact study, 400 m away
- Mining of Minor Minerals (Sand) from the river bed of River Sutlej having… — under environmental review, 400 m away
- Mining of Minor Minerals (Sand) from the river bed of River Sutlej having… — cleared for impact study, 400 m away
More from Sucha singh in Jalandhar
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.