Quick answers
What is this project?
Transfer of E.C For Sand Mining Project Near Village- Laalewal, District- SBS Nagar, Punjab ,Area 9.00 ha From Executive Engineer cum District Mining officer SBS Nagar to M/s Akash Enterprises is an approved mining project in Khoja, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The site covers 22.2 acres.
Who is building it?
The applicant is Harpreet Singh Gulati.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Apr 2026), as of 27 Nov 2026.
Where is it?
In Khoja, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹2.6 crore and a site of 22.2 acres.
When was it filed?
The application was filed on 23 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Apr 2026 |
| Application filed | 23 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Harpreet Singh Gulati |
| Land area | 22.2 acres (9 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | Khoja |
| Taluk / tehsil | Nawanshahr |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01360 |
In context
48 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Mining): 30 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 22.2 acres, this one is larger than 71% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Khoja, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand mining project, Village- Laalewal, District- SBS Nagar State… — environmental approval granted, 0 m away
- Proposed Sand mining project, Village- Laalewal, District- SBS Nagar State… — cleared for impact study, 0 m away
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — lapsed, 850 m away
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — cleared for impact study, 850 m away
- Proposed sand mining project as per DSR NO. SEIAA/MS/2023/212 on the Sutlej… — returned to applicant, 850 m away
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_70) — cleared for impact study, 1.3 km away
- Proposed sand mining project as per DSR No. SEIAA/MS/2023/212 on the Sutlej… — returned to applicant, 1.3 km away
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — lapsed, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.