Quick answers
What is this project?
Permission for construction of Approach Access to M/S HANSTECH SEEDS PRIVATE LIMITED is an approved project in Bhanra, Patiala, Punjab. The site covers 2.6 acres.
Who is building it?
The applicant is Hanstech Seeds Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 20 Jun 2025), as of 27 Nov 2026.
Where is it?
In Bhanra, Patiala, Punjab.
How big is it?
It has a stated cost of ₹2 crore; a site of 2.6 acres and 750 m² of forest land.
When was it filed?
The application was filed on 29 Sept 2024.
Project details
| Official title | Permission for construction of Approach Access to M/S HANSTECH SEEDS PRIVATE LIMITED at Vill: Bhanra Tehsil & Distt: Patiala. |
|---|---|
| Status | Forest land use approved |
| Status since | 20 Jun 2025 |
| Application filed | 29 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Hanstech Seeds Private Limited |
| Land area | 2.6 acres (1.1 ha) |
| Forest land | 750 m² |
| Project cost | ₹2 crore |
| Village / locality | Bhanra |
| Taluk / tehsil | Patiala |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01868 |
In context
33 applications in Patiala since January 2022 are in the same category (Other): 10 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 2.6 acres, this one is larger than 53% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhanra, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for construction of approach Access to Proposed Hotel Building By… — forest land use approved, 3 km away
- Permission for construction of approach Access Retail Outlet of Bharat… — forest land use approved, 3.6 km away
- Permission for construction of approach Access to Proposed Hotel Building of… — forest land use approved, 3.7 km away
- Guraya's Country Side Resort — lapsed, 3.7 km away
- Retail Outlet Of Indian Oil Corporation Limited — forest land use approved, 4.1 km away
- Upgradation of 44 Mtr. Single Span Steel Bridge on BML at RD 70 of Patiala –… — forest land use approved, 5.5 km away
- Permission of forest land construction of approach access to "ITALIAN MARINA"… — forest land use approved, 6.3 km away
- Laying the Ofc on Various Routes As Per Drawing in Dist. Patiala — lapsed, 7.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.