Quick answers
What is this project?
Diversion of 0.0210 Ha of forest land permission for Construction of Damaged Bridge on Bhakhra Main Line is a lapsed road project in Dhaneta, Samana, Patiala, Punjab. The site covers 0 acres.
Who is building it?
The applicant is Executive Engineer Construction Division Public Works Department Patiala.
Has it been approved?
No. The application was lapsed on 28 Jan 2024, so it is no longer under consideration.
Where is it?
In Dhaneta, Samana, Patiala, Punjab.
How big is it?
It has a stated cost of ₹4.1 crore; a site of 0 acres and 210 m² of forest land.
When was it filed?
The application was filed on 6 Jan 2023.
Project details
| Official title | Diversion of 0.0210 Ha of forest land permission for Construction of Damaged Bridge on Bhakhra Main Line at Vill: Dhanetha Tehsil: Samana Distt: Patiala on Retgarh-Shatrana road Km 1-3 B/S under Fores |
|---|---|
| Status | Lapsed |
| Status since | 28 Jan 2024 |
| Application filed | 6 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Construction Division Public Works Department Patiala |
| Land area | 200 m² |
| Forest land | 210 m² |
| Project cost | ₹4.1 crore |
| Village / locality | Dhaneta |
| Taluk / tehsil | Samana |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01968 |
In context
68 applications in Patiala since January 2022 are in the same category (Roads & highways): 24 approved, 13 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhaneta, Samana, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for construction of approach access to D.A.V Public School — forest land use approved, 2 km away
- CNG Station of M/S Torrent Gas Pvt. Ltd — forest land use approved, 2.2 km away
- Permission for construction of approach Access to Silicon Spaces (Proposed… — more information requested, 2.9 km away
- Permission for construction of approach Access to Residential Colony By… — forest land use approved, 3.2 km away
- Permission for construction of approach Access to M/s Melbourne Central… — more information requested, 3.2 km away
- Project by M/s Melbourne Central — lapsed, 3.2 km away
- Permission for construction of approach Access Retail Outlet of Bharat… — forest land use approved, 4.2 km away
- 11 Mld Water Treatment Plant and Other Related Works Including 5 Year… — more information requested, 4.3 km away
More from Executive Engineer Construction Division Public Works Department Patiala in Patiala
- Improvement of Sharp curve on Choa Branch Km 93-94 L/S (adjoin… — lapsed
- Samana Bypass along Karamgarh Minor RD Samana-Patiala Bridge to… — lapsed
- Diversion of 3.822 Ha of forest land permission for Upgradation of… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.