LapsedPipelines · Rupnagar, Punjab

Diversion of 0.14 Ha. Forest land permission for Construction of Pump House & Overhead Storage Reservoir and Laying underground pipeline to provide lift irrigation facilities to village Bhairo Majra, Fatehgarh Tapprian, Jattana, Jagatpur, Muzafat etc in Distt Rupnagar from Sirhind Canal at RD 53000 right side of Rupnagar to Chamkaur Sahib Road (Total Length= 70 m).

Diversion of 0.14 Ha. Forest land permission for Construction of Pump House & Overhead Storage Reservoir and Laying underground pipeline to provide lift irrigation facilities to village Bhairo Majra, Fatehgarh Tapprian, Jattana, Jagatpur, Muzafat etc in Distt Rupnagar from Sirhind Canal at RD 53000 right side of Rupnagar to Chamkaur Sahib Road (Total Length= 70 m) is a lapsed pipeline project in Chamkor Sahib, Chamkaur Sahib, Rupnagar, Punjab. The site covers 0.3 acres. Its stated project cost is ₹6.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 24 Apr 2026).

See it on the live map All projects in Rupnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.14 Ha. Forest land permission for Construction of Pump House & Overhead…

Project details

StatusLapsed
Status since24 Apr 2026
Application filed24 Mar 2026
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantPunjab Water Resources Management & Development Corporation Limited
Land area1,400 m²
Forest land1,650 m²
Project cost₹6.5 crore
Village / localityChamkor Sahib
Taluk / tehsilChamkaur Sahib
DistrictRupnagar
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-02371

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Jul 2026Lapsed0.3 acres₹6.5 crore
New project filed 24 Mar 2026 (this page)Lapsed0.3 acres₹6.5 crore

In context

16 applications in Rupnagar since January 2022 are in the same category (Pipelines): 8 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.3 acres, this one is smaller than 75% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chamkor Sahib, Chamkaur Sahib, Rupnagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Punjab Water Resources Management & Development Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.