Quick answers
What is this project?
This proposed road project by M/S Pidilite Industries Limited, situated at Village Majri Faqiran & Sohne Majra. Tehsil Rajpura Distt. Patiala (PB). is in Majri Fakiran, Rajpura, Patiala, Punjab. The site covers 31 acres.
Who is building it?
The applicant is Pidilite Industries Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Majri Fakiran, Rajpura, Patiala, Punjab.
How big is it?
It has a stated cost of ₹300 crore; a site of 31 acres and 730 m² of forest land.
When was it filed?
The application was filed on 9 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 9 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Pidilite Industries Limited |
| Land area | 31 acres (12.6 ha) |
| Forest land | 730 m² |
| Project cost | ₹300 crore |
| Village / locality | Majri Fakiran |
| Taluk / tehsil | Rajpura |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02521 |
In context
68 applications in Patiala since January 2022 are in the same category (Roads & highways): 24 approved, 13 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 31 acres, this one is larger than 93% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Majri Fakiran, Rajpura, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s Pidilite Industries Limited — cleared for impact study, 0 m away
- Permission for forest land construction of approach access to Saw Mill of… — forest land use approved, 1.7 km away
- Permission for Forest land for construction of approach Access Retail Outlet… — forest land use approved, 1.8 km away
- Const of H/L Bridge on SYL canal RD Kami Kalan pull to Lachru Pull B/s,… — forest land use approved, 3.1 km away
- High Level Bridge on Narwana Branch Canal X-ing Narwana Branch Canal 147-149… — forest land use approved, 4.4 km away
- Expansion of existing Industrial Building of M/s Mrs. Bectors Food… — environmental approval granted, 4.7 km away
- Expansion of existing industry of Tube Investments of India Limited (Unit:… — environmental approval granted, 6.5 km away
- Amendment In Environmental Clearance For Pesticide Manufacturing Unit at… — lapsed, 6.5 km away
More from Pidilite Industries Limited in Patiala
- Industrial project by M/s Pidilite Industries Limited — cleared for impact study
All 14 Pidilite Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.