Quick answers
What is this project?
Diversion of 0.0613 Ha. of forest land for approach road to retail outlet of Reliance BP Mobility Limited is an approved fuel station in Kot Panaich, Khanna, Ludhiana, Punjab. The site covers 0.9 acres.
Who is building it?
The applicant is Harshbir Baidwan.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 Feb 2024), as of 27 Nov 2026.
Where is it?
In Kot Panaich, Khanna, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0.9 acres and 610 m² of forest land.
When was it filed?
The application was filed on 12 Mar 2023.
Project details
| Official title | Diversion of 0.0613 Ha. of forest land for approach road to retail outlet of Reliance BP Mobility Limited at Village Kot Panech on G.T Road NH-01 (New NH-44) at Km. 287.753 (RHS) Tehsil Khanna & Distt. Ludhiana, Punjab |
|---|---|
| Status | Forest land use approved |
| Status since | 6 Feb 2024 |
| Application filed | 12 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Harshbir Baidwan |
| Land area | 3,600 m² |
| Forest land | 610 m² |
| Project cost | ₹80 lakh |
| Village / locality | Kot Panaich |
| Taluk / tehsil | Khanna |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02527 |
In context
32 applications in Ludhiana since January 2022 are in the same category (Fuel stations): 22 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.9 acres, this one is larger than 69% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kot Panaich, Khanna, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.00638 ha of forest land permission for construction of approach… — forest land use approved, 250 m away
- Expansion of Spinning Mill unit namely M/s Arisudana Industries Limited… — under environmental review, 1.6 km away
- Industrial project by M/s Ludhiana Steel Rolling Mills Limited — environmental approval granted, 1.7 km away
- Expansion in existing unit for "Proposed Technical Grade Pesticide… — environmental approval granted, 1.8 km away
- Expansion in existing unit for "Proposed Technical Grade Pesticide… — cleared for impact study, 1.8 km away
- Diversion of Forest Land For Access To The Proposed Site For Cng Station of… — forest land use approved, 1.9 km away
- Proposed Steel Manufacturing Unit having capacity 5,46,000 TPA of Steel… — returned to applicant, 2.2 km away
- Proposed Steel Manufacturing Unit having capacity 5,46,000 TPA of Steel… — cleared for impact study, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.