Quick answers
What is this project?
DiverPermission for construction of approach Access Retail Outlet of Nayara Energy Limited is a proposed fuel station in Ambe Mazra, Amloh, Fatehgarh Sahib, Punjab. The site covers 0.5 acres.
Who is building it?
The applicant is Nayara Energy Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Ambe Mazra, Amloh, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹2 crore; a site of 0.5 acres and 420 m² of forest land.
When was it filed?
The application was filed on 19 Apr 2026.
Project details
| Official title | DiverPermission for construction of approach Access Retail Outlet of Nayara Energy Limited at Vill: Ambey Majra Tehsil: Amloh & Distt: Fatehgarh Sahib. |
|---|---|
| Status | Under forest review |
| Status since | 23 Nov 2026 |
| Application filed | 19 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Nayara Energy Limited |
| Land area | 2,100 m² |
| Forest land | 420 m² |
| Project cost | ₹2 crore |
| Village / locality | Ambe Mazra |
| Taluk / tehsil | Amloh |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02645 |
In context
12 applications in Fatehgarh Sahib since January 2022 are in the same category (Fuel stations): 10 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.5 acres, this one is smaller than 58% of them.
75 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambe Mazra, Amloh, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in the existing Steel Manufacturing unit M/s Rudra Alloys Pvt. Ltd — environmental approval granted, 400 m away
- Existing steel manufacturing unit namely M/s Rudra Inn Pvt. Ltd — cleared for impact study, 500 m away
- Expansion of existing Steel Manufacturing Unit namely M/s Nabha Steels & Metals — lapsed, 500 m away
- Expansion of existing Steel Manufacturing Unit namely M/s Nabha Steels & Metals — environmental approval granted, 500 m away
- Expansion of existing Steel Manufacturing Unit namely M/s Nabha Steels & Metals — cleared for impact study, 500 m away
- Amendment in the Ec Vide No. Ec23b1010pb5745968n Dated 19.04.2024 of Unit M/S… — environmental approval granted, 550 m away
- Expansion in the existing Steel Manufacturing Unit M/s Fortune Metals Limited… — environmental approval granted, 550 m away
- Expansion in the existing Steel Manufacturing Unit M/s Fortune Metals Limited… — cleared for impact study, 550 m away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.