Quick answers
What is this project?
Diverision of 5.44 Hac. of Forest Land for the Purpose of Desilting of River Sutlej Village Asron Downstream of Ropar Headworks to Protect Nearby Abadies & Agricultural Land at Left Side of Sutlej River Rd (500-6250) is a lapsed mining project in Asron, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The site covers 13.4 acres.
Who is building it?
The applicant is Executive Engineer Ropar Drainage Cum Mining & Geology Division Wrd Punjab.
Has it been approved?
No. The application was lapsed on 10 Aug 2026, so it is no longer under consideration.
Where is it?
In Asron, Balachaur, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹2.2 crore; a site of 13.4 acres and 13.4 acres (5.4 ha) of forest land.
When was it filed?
The application was filed on 22 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Aug 2026 |
| Application filed | 22 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Executive Engineer Ropar Drainage Cum Mining & Geology Division Wrd Punjab |
| Land area | 13.4 acres (5.4 ha) |
| Forest land | 13.4 acres (5.4 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Asron |
| Taluk / tehsil | Balachaur |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02744 |
In context
48 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Mining): 30 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 13.4 acres, this one is smaller than 58% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Asron, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — environmental approval granted, 4.7 km away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — environmental approval granted, 4.9 km away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — environmental approval granted, 4.9 km away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — cleared for impact study, 4.9 km away
- Bajwa Gas Station of Think Gas Ludhiana Private Limited on Roopnagar to… — forest land use approved, 5.1 km away
- Building project by M/s Toppan Speciality Films Private Limited located at… — under environmental review, 5.6 km away
- Project by M/s Centrient Pharmaceuticals India Private Limited — initial checks, 6 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — environmental approval granted, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.