Project details
| Status | More information requested |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 28 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹30 lakh |
| Village / locality | Fatehpur (337) |
| Taluk / tehsil | Garhshankar |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02810 |
In context
22 applications in Hoshiarpur since January 2022 are in the same category (Telecom): 15 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Fatehpur (337), Garhshankar, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Installation of BSNL mobile tower at village Kothi Tehsil Garhshankar District… — more information requested, 950 m away
- Ecotourism of M/S Vanasthali — lapsed, 2.8 km away
- Heerakk Eco Resort — lapsed, 5.4 km away
- Heerakk Eco Resort — lapsed, 5.4 km away
- Proposed Commercial Shops — lapsed, 7.2 km away
- The Celebrations (Marriage Palace) — forest land use approved, 7.3 km away
- Proposed Retail Outlet of Nayara Energy Limited — forest land use approved, 7.6 km away
- Commercial Colony Named "downtown 24" — lapsed, 7.8 km away
More from Mahesh Nair in Hoshiarpur
- Installation of BSNL mobile tower at village Kothi Tehsil Garhshankar District… — more information requested
- New Bsnl Mobile Tower — forest land use approved
- BSNL Mobile Tower under 4G Saturation Project — forest land use approved
- New Bsnl Mobile Tower — forest land use approved
- New Bsnl Mobile Tower — forest land use approved
- New Bsnl Mobile Tower — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.