What is this project?
Permission for construction of Approach Access for Residential Colony by M/S Shalimar Developers at Patiala-Sanour Road Km 6-7 R/S Vill: Sanour Tehsil & Distt: Patiala is an approved building project in Sanaur, Patiala, Punjab. The site covers 13.6 acres.
Who is building it?
The applicant is Shalimar Developers.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Apr 2026), as of 27 Nov 2026.
Where is it?
In Sanaur, Patiala, Punjab.
How big is it?
It has a stated cost of ₹8 crore; a site of 13.6 acres and 230 m² of forest land.
When was it filed?
The application was filed on 28 Jan 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 23 Apr 2026 |
| Application filed | 28 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shalimar Developers |
| Use | Other |
| Land area | 13.6 acres (5.5 ha) |
| Forest land | 230 m² |
| Plot area | 229 m² (2,465 sq ft) |
| Project cost | ₹8 crore |
| Village / locality | Sanaur |
| Taluk / tehsil | Patiala |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03102 |
In context
104 applications in Patiala since January 2022 are in the same category (Buildings & townships): 67 approved, 25 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 13.6 acres, this one is larger than 69% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sanaur, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- ResidentialColony namely "Dream City" of M/s Shalimar Infra at… — lapsed, 700 m away
- Permission for construction of approach Access to Proposed Residential Colony… — more information requested, 1.1 km away
- Permission for construction of approach Access to Ambika Parklands… — forest land use approved, 1.1 km away
- Road project by Shree Radha Krishan Developers — lapsed, 1.2 km away
- Approach Access Retail Outlet Of Hindustan Petroleum Corporation Limited — forest land use approved, 1.6 km away
- Permission for construction of approach Access to "THE BRITISH CO-ED HIGH… — in-principle approval, conditions pending, 1.8 km away
- The Eden Luxe Patiala — under forest review, 1.9 km away
- Retail Outlet of Indian Oil Corporation Limited — forest land use approved, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.