Quick answers
What is "the Royal Legacy Marriage Palace"?
"the Royal Legacy Marriage Palace" is a lapsed project in Pojewal, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The site covers 1.8 acres.
Who is building it?
The applicant is The Royal Legacy.
Has it been approved?
No. The application was lapsed on 2 May 2026, so it is no longer under consideration.
Where is it?
In Pojewal, Balachaur, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹4 crore; a site of 1.8 acres and 1.8 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 25 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: The Royal Legacy Marriage Palace
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 May 2026 |
| Application filed | 25 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | The Royal Legacy |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹4 crore |
| Village / locality | Pojewal |
| Taluk / tehsil | Balachaur |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03137 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Apr 2026 | Lapsed | 1.8 acres | ₹4 crore |
| New project filed 25 Sept 2025 (this page) | Lapsed | 1.8 acres | ₹4 crore |
In context
6 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Other): 0 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pojewal, Balachaur, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Royal Legacy Marriage Palace — lapsed, 0 m away
- Pojewal Distributory No. 2 and Its Distribution System Off Taking at R.D.… — forest land use approved, 1.9 km away
- Pojewal Distributory No. 2 and Its Distribution System of Taking at R.D.… — lapsed, 3.3 km away
- Proposal Pump Room, Labour Room For Watering And Taking Care of Plants And Trees — lapsed, 4.6 km away
- Pojewal Distributory No. 2 and Its Distribution System Off Taking at R.D.… — forest land use approved, 6.4 km away
- City Gad distribution — more information requested, 13.1 km away
- Approach Road for Proposed Retail Outlet by HPCL — forest land use approved, 14.2 km away
- Sohan Emporio — lapsed, 14.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.