Quick answers
What is this project?
: Diversion of 0.036 Ha. Forest Land Permission for Laying Underground Pipeline to Provide Lift Irrigation Facilities to Village Rattipur in Distt Ludhiana From Sirhind Canal at Rd 114740 Right Side of Ropar to Ludhianaroad Project for Supplying Water for Irrigation Purposes to Village Rattipur by Lifting Water From Sirhind Canal Distt Ludhiana in Punjab State Under Forest Division, Ludhiana is a lapsed pipeline project in Ratipur, Samrala, Ludhiana, Punjab. The site covers 0.1 acres.
Who is building it?
The applicant is Hardeep Singh (Divisional Engineer).
Has it been approved?
No. The application was lapsed on 23 Apr 2026, so it is no longer under consideration.
Where is it?
In Ratipur, Samrala, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹1.3 crore; a site of 0.1 acres and 360 m² of forest land.
When was it filed?
The application was filed on 12 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Apr 2026 |
| Application filed | 12 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hardeep Singh (Divisional Engineer) |
| Land area | 400 m² |
| Forest land | 360 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Ratipur |
| Taluk / tehsil | Samrala |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03145 |
In context
8 applications in Ludhiana since January 2022 are in the same category (Pipelines): 1 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ratipur, Samrala, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road project by Panj Aab Bio Fuel & Fertilizers Private Limited — forest land use approved, 400 m away
- Diversion of 0.0303 Ha. Forest Land Permission for Laying Underground Pipeline… — lapsed, 1.5 km away
- 11MLD Water Treatment Plant, Construction of New OHSR 2.0 Lakh Gallan and… — more information requested, 1.5 km away
- Permission for construction of approach Access to Agro Warehouse Building of… — lapsed, 1.6 km away
- Diversion of 0.034 Ha. Forest Land Permission for Laying Underground Pipeline… — lapsed, 2.3 km away
- Diversion of 0.028 Ha Forest Land Permission for Laying Underground Pipeline… — more information requested, 3 km away
- Existing unit having Stand-Alone Rolling Mill via reheating furnace for the… — cleared for impact study, 3.4 km away
- Existing unit having Stand-Alone Rolling Mill via reheating furnace for the… — withdrawn, 3.4 km away
More from Hardeep Singh (Divisional Engineer) in Ludhiana
- Diversion of 0.0303 Ha. Forest Land Permission for Laying Underground Pipeline… — lapsed
- Diversion of 0.034 Ha. Forest Land Permission for Laying Underground Pipeline… — lapsed
About this information