Quick answers
What is this project?
Forest Land for Construction of Approach Road for Proposed Retail Outlet by IOCL is an approved fuel station in Shergarh, Abohar, Fazilka, Punjab. The site covers 0.3 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Jul 2025), as of 27 Nov 2026.
Where is it?
In Shergarh, Abohar, Fazilka, Punjab.
How big is it?
It has a stated cost of ₹1 crore; a site of 0.3 acres and 30 m² of forest land.
When was it filed?
The application was filed on 24 Jul 2024.
Project details
| Official title | Forest Land for Construction of Approach Road for Proposed Retail Outlet at Village Shergarh to Bhangerkhera Road Km 0-1 R/S |
|---|---|
| Status | Forest land use approved |
| Status since | 23 Jul 2025 |
| Application filed | 24 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1,300 m² |
| Forest land | 30 m² |
| Project cost | ₹1 crore |
| Village / locality | Shergarh |
| Taluk / tehsil | Abohar |
| District | Fazilka |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03171 |
In context
26 applications in Fazilka since January 2022 are in the same category (Fuel stations): 19 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.3 acres, this one is smaller than 88% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shergarh, Abohar, Fazilka, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Land for Access to Retail Outlet of M/S Bpcl by BPCL — forest land use approved, 1 km away
- Retail outlet of M/S BPCL Khatoni no 329/5, Khasra no. 103//15 — forest land use approved, 4.1 km away
- Retail outlet of M/s HPCL — forest land use approved, 4.4 km away
- Retail outlet of M/s BPCL Khasra no. 173//14/1/2 — forest land use approved, 12.8 km away
- Approach road for proposed Retail outlet by BPCL — forest land use approved, 15 km away
- Traction Sub Station at Panjkosi(Distt Fazilka) in C/W Electrification of… — lapsed, 15.9 km away
- Diversion of forest land in favour of Bharat Petroleum Corporation Ltd. for… — lapsed, 18.1 km away
- Approach road for proposed Retail outlet by BPCL — forest land use approved, 18.3 km away
More from Indian Oil Corporation Limited (IOCL) in Fazilka
- Proposed approach road to MSHSD Kisan Sewa Kendra (IOCL)at village Himmatpura… — under wildlife review
- Forest land for approach road to MSHSD Kisan Sewa Kendra (IOCL)at village… — lapsed
- Forest land for access to retail outlet of M/S IOCL — forest land use approved
- Proposed retail outlet (IOCL)at village Totianwala on Jalalabad-Bahmniwala… — forest land use approved
- Forest Land for Access to Retail Outlet of M/S Iocl by IOCL — forest land use approved
- Diversion of 0.0309 ha. Forest land for access to retail outlet of M/s IOCL — forest land use approved
8 Indian Oil Corporation (IOCL) projects in Fazilka
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.