Quick answers
What is this project?
Permission for construction of approach Access to Proposed Hotel Building of M/S ATS DEVELOPERS is a lapsed building project in Akoi Sahib, Sangrur, Punjab. The site covers 5.2 acres.
Who is building it?
The applicant is Ats Developers.
Has it been approved?
No. The application was lapsed on 30 Jun 2024, so it is no longer under consideration.
Where is it?
In Akoi Sahib, Sangrur, Punjab.
How big is it?
It has a stated cost of ₹2 crore; a site of 5.2 acres and 110 m² of forest land.
When was it filed?
The application was filed on 31 Mar 2024.
Project details
| Official title | Permission for construction of approach Access to Proposed Hotel Building of M/S ATS DEVELOPERS at Vill: Akoi Sahib Tehsil & Distt: Sangrur |
|---|---|
| Status | Lapsed |
| Status since | 30 Jun 2024 |
| Application filed | 31 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ats Developers |
| Land area | 5.2 acres (2.1 ha) |
| Forest land | 110 m² |
| Project cost | ₹2 crore |
| Village / locality | Akoi Sahib |
| Taluk / tehsil | Sangrur |
| District | Sangrur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03188 |
In context
20 applications in Sangrur since January 2022 are in the same category (Buildings & townships): 9 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 5.2 acres, this one is smaller than 60% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Akoi Sahib, Sangrur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Approach Road for Proposed Retail Outlet — forest land use approved, 150 m away
- Road project by M/S ATS DEVELOPERS Akoi, Tehsil & Distt- Sangrur. — more information requested, 200 m away
- Permission for construction of approach Access to Proposed Commercial Colony… — forest land use approved, 300 m away
- Commercial Project "Fun Square Green City" — lapsed, 350 m away
- Permission for Approach Access to M/s Shagun Resorts (Marriage Palace) Vill… — lapsed, 850 m away
- Approach road to Commercial Colony Namely "Madhav Shopping Complex" of M/s… — more information requested, 3.2 km away
- Diversion of 0.2979 ha Protected Forest Land & Tree Cutting Permission (Strip… — lapsed, 3.4 km away
- H.S. Agriculture — lapsed, 3.8 km away
More from Ats Developers in Sangrur
- Road project by M/S ATS DEVELOPERS Akoi, Tehsil & Distt- Sangrur. — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.