Quick answers
What is this project?
Diversion of Forest Land for Improvement of Existing Road,geometric Design,safety Measures and Other Related Work for the Road NH-154 a From 0.00 to 39.36 Km Upto Himachal Pradesh Boundary is a lapsed road project in Tika Saroh, Dhar Kalan, Pathankot, Punjab. It seeks 85.1 acres of forest land.
Who is building it?
The applicant is Executive Engineer Central Works Division Pwd (B&r).
Has it been approved?
No. The application was lapsed on 8 Apr 2024, so it is no longer under consideration.
Where is it?
In Tika Saroh, Dhar Kalan, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹503 crore and 85.1 acres (34.4 ha) of forest land.
When was it filed?
The application was filed on 5 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Apr 2024 |
| Application filed | 5 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Central Works Division Pwd (B&r) |
| Forest land | 85.1 acres (34.4 ha) |
| Project cost | ₹503 crore |
| Village / locality | Tika Saroh |
| Taluk / tehsil | Dhar Kalan |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03238 |
In context
16 applications in Pathankot since January 2022 are in the same category (Roads & highways): 5 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tika Saroh, Dhar Kalan, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retail outlet of HPCL — more information requested, 1 km away
- Mining project by M/S Balaji Stone Crusher — more information requested, 3.8 km away
- ECO Resort — lapsed, 5.4 km away
- Castle Nature Hill Resort — lapsed, 7.9 km away
- Castle Nature Hills Eco Resort — lapsed, 8 km away
- The Eco Friendly Centre for Yoga Meditation Health and Wellness — lapsed, 8 km away
- Petrol Pump — more information requested, 8.3 km away
- BSNL Mobile tower under 4G Saturation Project — forest land use approved, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.