Quick answers
What is this project?
Estimate for Desilting in Longitudinal Length Opp. Ismailpur Complex ,rd 139500-145000 of 3/R Bandh to Guide the Flow of River Sutlej is a lapsed water and irrigation project in Paraliwala (218), Dharamkot, Moga, Punjab. The site covers 24.7 acres.
Who is building it?
The applicant is Executive Engineer -Cum- District Mining Officer Jalandhar.
Has it been approved?
No. The application was lapsed on 10 Aug 2026, so it is no longer under consideration.
Where is it?
In Paraliwala (218), Dharamkot, Moga, Punjab.
How big is it?
It has a stated cost of ₹2.2 crore; a site of 24.7 acres and 12.8 acres (5.2 ha) of forest land.
When was it filed?
The application was filed on 9 Apr 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Aug 2026 |
| Application filed | 9 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer -Cum- District Mining Officer Jalandhar |
| Land area | 24.7 acres (10 ha) |
| Forest land | 12.8 acres (5.2 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Paraliwala (218) |
| Taluk / tehsil | Dharamkot |
| District | Moga |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03301 |
In context
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Paraliwala (218), Dharamkot, Moga, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mehruwala Sand Mining Project, Executive Engineer/Ferozepur,… — environmental approval granted, 1.7 km away
- Estimate for Desilting in Longitudinal Length Opp. Rajewal Complex ,rd… — lapsed, 2.3 km away
- Sand mining project namely Adraman 2 in the river bed of River Sutlej — lapsed, 4.9 km away
- Adraman-2 Sand Mining Project, Executive Engineer/Ferozepur,… — environmental approval granted, 4.9 km away
- Adraman-2 Sand Mining Project, Executive Engineer/Ferozepur,… — environmental approval granted, 4.9 km away
- Adraman-2 Sand Mining Project, Executive Engineer/Ferozepur,… — cleared for impact study, 4.9 km away
- Sanghera Sand Mining Project, Executive Engineer/Ferozepur,… — environmental approval granted, 5.9 km away
- Sanghera Sand Mining Project, Executive Engineer/Ferozepur,… — cleared for impact study, 5.9 km away
More from Executive Engineer -Cum- District Mining Officer Jalandhar in Moga
All 37 Executive Engineer -Cum- District Mining Officer Jalandhar, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.