Quick answers
What is this project?
Large Surface Water Project Ghattian Wali Bodla For providing bulk supply of treated water to large group of villages in Block Jalalabad , Arniwala Sheikh Subhan & Fazilka District Fazilka ( Punjab) on DBOT basis is an approved pipeline project in Aliana, Fazilka, Punjab. The site covers 0.4 acres.
Who is building it?
The applicant is Public Works Department.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 22 Nov 2023), as of 27 Nov 2026.
Where is it?
In Aliana, Fazilka, Punjab.
How big is it?
It has a stated cost of ₹20 crore; a site of 0.4 acres and 1,640 m² of forest land.
When was it filed?
The application was filed on 25 Jul 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Nov 2023 |
| Application filed | 25 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Public Works Department |
| Land area | 1,600 m² |
| Forest land | 1,640 m² |
| Project cost | ₹20 crore |
| Village / locality | Aliana |
| Taluk / tehsil | Fazilka |
| District | Fazilka |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03453 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Jul 2023 (this page) | Forest land use approved | 0.4 acres | ₹20 crore |
| New project filed 20 Jun 2023 | More information requested | 0.3 acres | ₹1.4 crore |
In context
16 applications in Fazilka since January 2022 are in the same category (Pipelines): 3 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. At 0.4 acres, this one is smaller than 64% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aliana, Fazilka, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Large Surface Water Project Ghattian Wali Bodla For providing bulk supply of… — more information requested, 750 m away
- Forest Land Permission for Proposed Underground Water Pipe Line and Tubewell… — lapsed, 4.6 km away
- Diversion of 1.8023 ha. Forest Land for Laying OFC along the route from (1)… — forest land use approved, 4.7 km away
- Proposed underground water pipe line on Malout-Fazilka Road KM 29 to 30 B/s — forest land use approved, 5.5 km away
- Laying of Sewerage Pipe Line along the SH-40, from CH 26+881 to 29+110(RHS)… — lapsed, 6.5 km away
- Forest Land Permission for Proposed Underground Water Pipe Line and Tubewell… — lapsed, 7.2 km away
- Forest land for access to retail outlet of M/S IOCL — forest land use approved, 7.7 km away
- Forest Land for Access to Retail Outlet of M/S Iocl by IOCL — forest land use approved, 7.7 km away
More from Public Works Department in Fazilka
- Re- Diversion of 0.5725 Ha. Forest Land Permission for Proposed Underground… — more information requested
- Re- Diversion of 0.5725 Ha. Forest Land Permission for Proposed Underground… — decision issued
- Large Surface water Supply Project Patrewala Teh. Abohar Distt Fazilka for… — forest land use approved
- Div. of 0.6661 ha. Forest land Permission for Proposed Laying of Clear Water… — more information requested
- Div. of 1.1827 ha. Forest land Permission for Proposed Laying of Clear Water… — more information requested
- Forest Land Permission for Proposed Underground Drinking Water Pipe Line on… — lapsed
10 Public Works Department, Punjab projects in Fazilka
All 24 Public Works Department, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.