What is Developing? Open the mapMap

LapsedPower · Fazilka, Punjab

Diversion of 0.71 hec of forest land in favour of Punjab State Transmission Corporation Limited for Construction of 220 KV Switching Station at Bahawal Bassi

Diversion of 0.71 hec of forest land in favour of Punjab State Transmission Corporation Limited for Construction of 220 KV Switching Station at Bahawal Bassi is a lapsed power project in Bahawalbasi, Abohar, Fazilka, Punjab. The site covers 1.8 acres. Its stated project cost is ₹4 crore. As of 27 Nov 2026, its status is “Lapsed” (since 2 Aug 2026).

See it on the live map All projects in Fazilka

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.71 hec of forest land in favour of Punjab State Transmission Corporation Limited for Construction of 220 KV Switching Station at Bahawal Bassi is a lapsed power project in Bahawalbasi, Abohar, Fazilka, Punjab. The site covers 1.8 acres.

Who is building it?

The applicant is Punjab State Transmission Corporation Limited.

Has it been approved?

No. The application was lapsed on 2 Aug 2026, so it is no longer under consideration.

Where is it?

In Bahawalbasi, Abohar, Fazilka, Punjab.

How big is it?

It has a stated cost of ₹4 crore; a site of 1.8 acres and 1.8 acres (0.7 ha) of forest land.

When was it filed?

The application was filed on 1 Jul 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.71 hec of forest land in favour of Punjab State Transmission Corporation…

Project details

Official titleDiversion of 0.71 hec of forest land in favour of Punjab State Transmission Corporation Limited for Construction of 220 KV Switching Station at Bahawal Bassi in District Fazilka & Forest Division Shri Muktsar Sahib by Senior Executive Engineer, Civil Works Division, PSTCL, Jalandhar.
StatusLapsed
Status since2 Aug 2026
Application filed1 Jul 2026
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantPunjab State Transmission Corporation Limited
Land area1.8 acres (0.7 ha)
Forest land1.8 acres (0.7 ha)
Project cost₹4 crore
Village / localityBahawalbasi
Taluk / tehsilAbohar
DistrictFazilka
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-03454

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 11 Oct 2026Under forest review1.8 acres₹4 crore
New project filed 1 Jul 2026 (this page)Lapsed1.8 acres₹4 crore

In context

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bahawalbasi, Abohar, Fazilka, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

3 Punjab State Transmission Corporation projects in Fazilka
All 7 Punjab State Transmission Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.