Project details
| Official title | Constructions of High Level Bridge Over River Ravi at Makoura Pattan Including Protection Work and Its Approaches in District Pathankot in State of Punjab |
|---|---|
| Status | Forest land use approved |
| Status since | 17 Aug 2026 |
| Application filed | 3 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Rajiv Kumar |
| Land area | 4.8 acres (1.9 ha) |
| Forest land | 4.8 acres (1.9 ha) |
| Project cost | ₹108 crore |
| Village / locality | Makaura |
| Taluk / tehsil | Gurdaspur |
| District | Gurdaspur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03553 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 May 2023 (this page) | Forest land use approved | 4.8 acres | ₹108 crore |
| New project filed 6 Oct 2022 | Lapsed | 4.8 acres | ₹108 crore |
In context
16 applications in Gurdaspur since January 2022 are in the same category (Roads & highways): 6 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 4.8 acres, this one is larger than 75% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Makaura, Gurdaspur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Constructions of High Level Bridge Over River Ravi at Makoura Pattan Including… — lapsed, 0 m away
- Diversion of 0.0026 ha of forest land for construction of approach road to new… — forest land use approved, 1.8 km away
- Commercial / Hotel / Banquet Hall — forest land use approved, 6.5 km away
- Fuel station by Petrol pump of Reliance BP Mobility Ltd — in-principle approval, conditions pending, 7.7 km away
- Diversion of 0.0059 Ha of Forest Land for Approach Road to Commercial Building — lapsed, 8.6 km away
- Diversion of 0.0097 Ha of Forest Land for Approach Road to Proposed Friends… — more information requested, 10.7 km away
- Diversion of 0.0070 Ha of Forest Land for Approach Road to Residential Coloney… — forest land use approved, 10.8 km away
- Diversion of 0.0089 Ha of Forest Land for Approach Road to Commercial Site — lapsed, 10.8 km away
More from Rajiv Kumar in Gurdaspur
- Widening of Road — lapsed