Quick answers
What is this project?
Construction of Aqueduct at RD 71000 of Arnauli Distributory Detail is a proposed project in Bir Bhunarheri Rf, Patiala, Punjab. The site covers 0.1 acres.
Who is building it?
The applicant is Bhakra Main Line Canal & Ground Water Division Patiala.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Bir Bhunarheri Rf, Patiala, Punjab.
How big is it?
It has a stated cost of ₹56 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 8 Nov 2023.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 8 Nov 2023 |
| Application filed | 8 Nov 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Bhakra Main Line Canal & Ground Water Division Patiala |
| Land area | 300 m² |
| Project cost | ₹56 lakh |
| Village / locality | Bir Bhunarheri Rf |
| Taluk / tehsil | Patiala |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03612 |
In context
33 applications in Patiala since January 2022 are in the same category (Other): 10 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.1 acres, this one is smaller than 97% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bir Bhunarheri Rf, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for construction of approach Access Retail Outlet Of Bharat… — forest land use approved, 1.1 km away
- Permission for construction of approach Access Retail Outlet Of Bharat… — in-principle approval, conditions pending, 3.3 km away
- Permission for construction of approach Access Retail Outlet Of Bharat… — forest land use approved, 3.4 km away
- Diversion of 0.0030 Hec. Forest Land Permission for Laying Underground… — more information requested, 3.6 km away
- Diversion of 0.0136 Hac Forest Land Permission for Laying Underground Pipeline… — under forest review, 3.6 km away
- Diversion of 0.0136 Hac Forest Land Permission for Laying Underground Pipeline… — more information requested, 3.6 km away
- Maa Sheetla Filling Station — forest land use approved, 5.9 km away
- Diversion of 0.0622 ha of forest land permission for construction of approach… — lapsed, 6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.