Quick answers
What is this project?
Desilting of River Bed Material to increase Water Carrying Capacity of River Ravi In between RD 52400-56650 is a proposed building project in Kathlaur, Pathankot, Punjab. The site covers 86.4 acres.
Who is building it?
The applicant is Executive Engineer Drainage Mining Division Pathankot.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kathlaur, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹9.6 crore and a site of 86.4 acres.
When was it filed?
The application was filed on 8 Feb 2026.
Project details
| Official title | Desilting of River Bed Material to increase Water Carrying Capacity of River Ravi In between RD 52400-56650 in Village Kathlour District Pathankot |
|---|---|
| Status | More information requested |
| Status since | 8 Feb 2026 |
| Application filed | 8 Feb 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Drainage Mining Division Pathankot |
| Land area | 86.4 acres (35 ha) |
| Project cost | ₹9.6 crore |
| Village / locality | Kathlaur |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03660 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Feb 2026 (this page) | More information requested | 86.4 acres | ₹9.6 crore |
| New project filed 7 Feb 2026 | Lapsed | 86.4 acres | ₹9.6 crore |
In context
5 applications in Pathankot since January 2022 are in the same category (Buildings & townships): 1 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kathlaur, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Desilting of Riverbed Material to increase Water carrying capacity of River… — more information requested, 0 m away
- Desilting of Riverbed Material to increase Water carrying capacity of River… — not approved, 0 m away
- Desilting of River Bed Material to increase Water Carrying Capacity of River… — lapsed, 0 m away
- Desilting of River Bed Material to increase Water carrying capacity of River… — more information requested, 1.3 km away
- Desilting of River Bed Material to increase Water carrying capacity of River… — more information requested, 1.3 km away
- Feasibility Report With Conservation and Mitigation Plan by Removal of Flood… — under wildlife review, 1.3 km away
- Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining… — under environmental review, 3.1 km away
- Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining… — cleared for impact study, 3.1 km away
More from Executive Engineer Drainage Mining Division Pathankot in Pathankot
- Feasibility Report With Conservation and Mitigation Plan by Removal of Flood… — under wildlife review
- Desilting of River Bed Material to increase Water carrying capacity of River… — more information requested
- Desilting of River Bed Material to increase Water carrying capacity of River… — more information requested
- Desilting of Riverbed Material to increase Water carrying capacity of River… — more information requested
- Desilting of Riverbed Material to increase Water carrying capacity of River… — not approved
All 7 Executive Engineer Drainage, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.