Diversion of 0.0697 Ha of forest land in favour of Executive Engineer Ropar Canal & Ground Water Division, WRD Punjab Ropar for Project Estimate of Lift Scheme for Villages Bilaspur, Gidhri, Katahri, Bowani, Lapran, Raul etc under Payal Constituency, intake from Bathinda Branch (Stage 2) is a proposed pipeline project in Jahangir, Payal, Ludhiana, Punjab. The site covers 0.2 acres.
Who is building it?
The applicant is Executive Engineer Ropar Canal and Ground Water Division Wrd Punjab Ropar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Jahangir, Payal, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹24.1 crore; a site of 0.2 acres and 700 m² of forest land.
When was it filed?
The application was filed on 18 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 18 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Executive Engineer Ropar Canal and Ground Water Division Wrd Punjab Ropar |
| Land area | 700 m² |
| Forest land | 700 m² |
| Project cost | ₹24.1 crore |
| Village / locality | Jahangir |
| Taluk / tehsil | Payal |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03772 |
In context
8 applications in Ludhiana since January 2022 are in the same category (Pipelines): 1 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jahangir, Payal, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- L-Section for Construction of 62 M Span Steel Truss Bride On Bathinda Branch… — forest land use approved, 150 m away
- Diversion of 0.139 Ha of forest land in favour of Executive Engineer Ropar… — initial checks, 2.3 km away
- Industrial project by M/S Fmi Limited — forest land use approved, 5.5 km away
- Construction of 54 M Span Steel Truss Bridge on Patiala Feeder Canal — forest land use approved, 5.7 km away
- Approach road to Proposed Factory belongs to M/s HAR JEE ALLOYS LTD — more information requested, 5.9 km away
- Industrial project by Har Jee Alloys PVT LTD — initial checks, 5.9 km away
- Nirmal Products (Warehouse Cum Packing Unit) — forest land use approved, 5.9 km away
- Kapil Steel Industries — lapsed, 6 km away
More from Executive Engineer Ropar Canal and Ground Water Division Wrd Punjab Ropar in Ludhiana
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.