One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Environmental Clearance for the Existing Steel Melting Plant to manufacturing…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 15 Jan 2024 |
| Application filed | 30 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kannappan Iron and Steel Company Private Limited |
| Land area | 6.9 acres (2.8 ha) |
| Project cost | ₹6.1 crore |
| Village / locality | Vanjiyur |
| Taluk / tehsil | Karaikal Taluk |
| District | Karaikal |
| State | Puducherry |
| Location from | Site boundary on record |
| Our reference | WID-PY-00015 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 11 May 2024 | Lapsed | 8 acres | ₹6.1 crore |
| Early planning filed 30 Dec 2023 (this page) | Withdrawn | 6.9 acres | ₹6.1 crore |
In context
16 applications in Karaikal since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 6.9 acres, this one is smaller than 94% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vanjiyur, Karaikal Taluk, Karaikal, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Environmental Clearance for the Existing Steel Melting Plant to… — lapsed, 0 m away
- Environment Clearance for Proposed Project for Custom Manufactured Chemicals… — environmental approval granted, 800 m away
- Environment Clearance for Proposed Project for Custom Manufactured Chemicals… — cleared for impact study, 800 m away
- Expansion of Caustic Soda Manufacturing Unit of Chemplast Sanmar… — lapsed, 900 m away
- Expansion of Caustic Soda Manufacturing Unit of Chemplast Sanmar… — cleared for impact study, 900 m away
- Expansion of EDC Manufacturing Unit of Chemplast Sanmar Limited-Karaikal — cleared for impact study, 900 m away
- Expansion of EDC Manufacturing Unit of Chemplast Sanmar Limited-Karaikal — returned to applicant, 900 m away
- Expansion of EDC Manufacturing Unit of Chemplast Sanmar Limited-Karaikal — cleared for impact study, 900 m away
About this information