Quick answers
What is this project?
Proposed 25 KLPD Grain-Based Distillery for Production of Extra Neutral Alcohol by M/s. Vijaya Industrial Alcohols is a lapsed industrial project in Kattery, Villianur Taluk, Puducherry. The site covers 11.4 acres.
Who is building it?
The applicant is V ravitchandirane.
Has it been approved?
No. The application was lapsed on 18 Oct 2026, so it is no longer under consideration.
Where is it?
In Kattery, Villianur Taluk, Puducherry.
How big is it?
It has a stated cost of ₹30.2 crore and a site of 11.4 acres.
When was it filed?
The application was filed on 22 Jun 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 25 KLPD Grain-Based Distillery for Production of Extra Neutral Alcohol by M/s.…
Project details
| Official title | Proposed 25 KLPD Grain-Based Distillery for Production of Extra Neutral Alcohol by M/s. Vijaya Industrial Alcohols at Lingareddypalayam Village Mannadipet Commune, Puducherry |
|---|---|
| Status | Lapsed |
| Status since | 18 Oct 2026 |
| Application filed | 22 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | V ravitchandirane |
| Land area | 11.4 acres (4.6 ha) |
| Project cost | ₹30.2 crore |
| Village / locality | Kattery |
| Taluk / tehsil | Villianur Taluk |
| District | Puducherry |
| State | Puducherry |
| Location from | Site boundary on record |
| Our reference | WID-PY-00034 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 22 Jun 2026 (this page) | Lapsed | 11.4 acres | ₹30.2 crore |
| Early planning filed 8 May 2026 | Cleared for impact study | 11.4 acres | ₹30.2 crore |
In context
12 applications in Puducherry since January 2022 are in the same category (Industry): 7 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. At 11.4 acres, this one is larger than 67% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kattery, Villianur Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 25 KLPD Grain-Based Distillery for Production of Extra Neutral… — cleared for impact study, 0 m away
- Proposed expansion of Meenakshi Steels from 100 TPD to 250 TPD of MS Billets… — cleared for impact study, 4.8 km away
- Proposed Expansion of Meenakshi Industries from 100 TPD to 250 TPD of MS… — cleared for impact study, 4.8 km away
- "Proposed Industrial Estate in Sedarapet & Karasur Villages, Villianur Taluk &… — under environmental review, 6.3 km away
- Existing Steel Melting Shop & Steel Rolling Mill in the unit of M/s. JBA Metal… — lapsed, 6.8 km away
- Pakshi_vanabhumi — under wildlife review, 10.9 km away
- Environmental clearance for the existing Steel Melting Plant & Rolling Mill… — lapsed, 12.1 km away
- Augmentation of Water Supply for Puducherry by Drawing 20 Mld of Water From… — application filed, 12.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.