Quick answers
What is this project?
Double Storied Residential Building (Ground +1 floor) at No.111, Sapthagiri Nagar, Thengaithittu, Puducherry is a lapsed building project in Thengathittu, Puducherry Taluk, Puducherry. The site covers 0 acres.
Who is building it?
The applicant is Gajalakshmi.
Has it been approved?
No. The application was lapsed on 20 Jul 2025, so it is no longer under consideration.
Where is it?
In Thengathittu, Puducherry Taluk, Puducherry.
How big is it?
It has a stated cost of ₹2 lakh and a site of 0 acres.
When was it filed?
The application was filed on 2 Apr 2025.
Project details
| Official title | Construction of Double Storied Residential Building (Ground +1 floor) at No.111, Sapthagiri Nagar, Thengaithittu, Puducherry |
|---|---|
| Status | Lapsed |
| Status since | 20 Jul 2025 |
| Application filed | 2 Apr 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gajalakshmi |
| Land area | 100 m² |
| Project cost | ₹2 lakh |
| Village / locality | Thengathittu |
| Taluk / tehsil | Puducherry Taluk |
| District | Puducherry |
| State | Puducherry |
| Location from | Site boundary on record |
| Our reference | WID-PY-00053 |
In context
80 applications in Puducherry since January 2022 are in the same category (Buildings & townships): 41 approved, 21 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
61 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thengathittu, Puducherry Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- TWO STOREYED RESIDENTIAL BUILDING FOR Tmt. C.VIJAYALAKSHMI AT R.S.NO.1pt,… — under coastal review, 50 m away
- Two Storeyed Residential Building (1 Dwelling Unit ) at Thengaithittu,… — lapsed, 400 m away
- Construction of a New House by Judah Catherina C — lapsed, 400 m away
- Institute of Driving Training and Research (IDTR) — recommended by coastal authority, 1 km away
- Proposed Construction of Marriage Hall — coastal clearance granted, 2 km away
- Proposed Constrution of Two Storyed Commercial Building With Stilt Floor — lapsed, 2.1 km away
- Proposed Two Storeyed Commercial Building — under coastal review, 2.1 km away
- Two storied Residential Building (3 Dwelling Units) after Demolishing the… — coastal clearance granted, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.