What is Developing? Open the mapMap

Under coastal reviewBuildings & townships · Puducherry, Puducherry

Four Storeyed Residential Flats Building (8-Dwelling Units) With Stilt Floor Building

Four Storeyed Residential Flats Building (8-Dwelling Units) With Stilt Floor Building is a proposed building project in Pondicherry(Puduchcheri), Puducherry Taluk, Puducherry. The site covers 0.1 acres. Its stated project cost is ₹3.3 crore. As of 27 Nov 2026, its status is “Under coastal review” (since 28 Aug 2024).

See it on the live map All projects in Puducherry

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Four Storeyed Residential Flats Building (8-Dwelling Units) With Stilt Floor Building is a proposed building project in Pondicherry(Puduchcheri), Puducherry Taluk, Puducherry. The site covers 0.1 acres.

Who is building it?

The applicant is Prabuddha Khare.

Has it been approved?

Not yet. The application is still under review: its status is “Under coastal review”, as of 27 Nov 2026.

Where is it?

In Pondicherry(Puduchcheri), Puducherry Taluk, Puducherry.

How big is it?

It has a stated cost of ₹3.3 crore and a site of 0.1 acres.

When was it filed?

The application was filed on 11 Aug 2024.

Project details

Official titleProposed Construction of Four Storeyed Residential Flats Building (8-Dwelling Units) With Stilt Floor Building
StatusUnder coastal review
Status since28 Aug 2024
Application filed11 Aug 2024
Approval soughtCoastal review
Application typeNew project
SectorBuildings & townships
ApplicantPrabuddha Khare
Land area600 m²
Project cost₹3.3 crore
Village / localityPondicherry(Puduchcheri)
Taluk / tehsilPuducherry Taluk
DistrictPuducherry
StatePuducherry
Location fromSite boundary on record
Our referenceWID-PY-00062

In context

80 applications in Puducherry since January 2022 are in the same category (Buildings & townships): 41 approved, 21 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.1 acres, this one is larger than 71% of them.

51 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pondicherry(Puduchcheri), Puducherry Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.