What is Developing? Open the mapMap

Cleared for impact studyMining · Barmer, Rajasthan

Juni Aati Masonry Stone Mining Project, Plot No. 88 favor of Shri Tan Singh S/o Sh. Deep Singh

Juni Aati Masonry Stone Mining Project, Plot No. 88 favor of Shri Tan Singh S/o Sh. Deep Singh is a proposed mining project in Ati, Barmer, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Nov 2022).

See it on the live map All projects in Barmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Juni Aati Masonry Stone Mining Project, Plot No. 88 favor of Shri Tan Singh S/o Sh. Deep Singh is a proposed mining project in Ati, Barmer, Rajasthan. The site covers 2.5 acres.

Who is building it?

The applicant is Tan Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 30 Nov 2022), as of 27 Nov 2026.

Where is it?

In Ati, Barmer, Rajasthan.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 2.5 acres.

When was it filed?

The application was filed on 30 Nov 2022.

Project details

StatusCleared for impact study
Status since30 Nov 2022
Application filed30 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantTan Singh
Land area2.5 acres (1 ha)
Project cost₹1.5 crore
Village / localityAti
Taluk / tehsilBarmer
DistrictBarmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-00040

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Sept 2024Lapsed2.5 acres₹1.5 crore
Early planning filed 30 Nov 2022 (this page)Cleared for impact study2.5 acres₹1.5 crore

In context

878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.

31 other mining leases have applied within 500 m of this site; together with this one they cover 941.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 42 mining leases have applied within 5 km.

Where it is

Ati, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Tan Singh in Barmer

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.